Skip to content

Namur 1

Cooper, South Australia

Namur 1 is a petroleum well in the Cooper, South Australia, operated by Delhi, drilled to a total depth of 2,518 m.

Request LAS Files & Well Summary

Well Information

Well Name
Namur 1
Basin
Cooper
State
South Australia
Classification
NEST
Operator
Delhi
Driller
Drilcon

Drilling Data

Total Depth
2,518 m
Datum Elevation
41.1 m
Spud Date
13/09/1976
Completion Date
16/10/1976
Permit
-

Location

Latitude
-28.1864
Longitude
140.4320

Available Log Data

1
Log Streams
12
Curves
100,250
Data Points
15,278
Metres

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 1625 m 2514 m 888 m
CALI 1640 m 2514 m 874 m

Density (2 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 1646 m 2514 m 868 m
RHOB 1646 m 2514 m 868 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 0 m 2500 m 2500 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 0 m 2514 m 2514 m

Resistivity (4 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 1629 m 2508 m 878 m
LLS 1629 m 2508 m 879 m
MSFL 1629 m 2511 m 882 m
RXO 1626 m 2513 m 887 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 158 m 2508 m 2350 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 1629 m 2513 m 883 m