Digital Wireline Logs for Pelican 08 - Ero
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Pelican 08 - Ero in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,772 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,772 m
- Datum Elevation
- 39.5 m
- Spud Date
- 17/05/2003
- Completion Date
- 10/06/2003
- Permit
- PPL 17
- Rig
- Rig 18
Location
- Latitude
- -27.8045
- Longitude
- 140.0800