Digital Wireline Logs for Raven 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Raven 3 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,681 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,681 m
- Datum Elevation
- 28.0 m
- Spud Date
- 07/03/2004
- Completion Date
- 20/03/2004
- Permit
- PPL 150
- Rig
- Rig 18
Location
- Latitude
- -28.0459
- Longitude
- 139.7310