Digital Wireline Logs for Verona 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Verona 3 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,066 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,066 m
- Datum Elevation
- 40.9 m
- Spud Date
- 25/12/2002
- Completion Date
- 14/01/2003
- Permit
- PPL 158
- Rig
- -
Location
- Latitude
- -27.1988
- Longitude
- 140.4470