Digital Wireline Logs for Windmill 1
Quote within 1 business day
Priced per curve-metre, capped at $2,000 per well
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Windmill 1 in the Cooper, South Australia, operated by Beach, drilled to a total depth of 2,100 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,100 m
- Datum Elevation
- 25.2 m
- Spud Date
- 01/10/2012
- Completion Date
- 15/10/2012
- Permit
- PEL 92
- Rig
- Rig 930
Location
- Latitude
- -27.9346
- Longitude
- 139.3820