Skip to content

Manya 5

Officer, South Australia

Manya 5 is a petroleum well in the Officer, South Australia, operated by Comalco, drilled to a total depth of 1,333 m.

Request LAS Files & Well Summary

Well Information

Well Name
Manya 5
Basin
Officer
State
South Australia
Classification
NESR
Operator
Comalco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
1,333 m
Datum Elevation
-
Spud Date
20/05/1982
Completion Date
10/05/1983
Permit
-

Location

Latitude
-27.5276
Longitude
134.0030

Available Log Data

1
Log Streams
8
Curves
64,475
Data Points
9,826
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 1 m 1332 m 1330 m

Density (1 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
RHOB 2 m 1332 m 1330 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 1 m 1330 m 1328 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 1 m 1333 m 1331 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NEUT 2 m 1333 m 1330 m

Resistivity (2 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LL7 6 m 1331 m 1324 m
PTR 408 m 1332 m 924 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 408 m 1333 m 924 m