Digital Wireline Logs for Bream B8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bream B8 in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 2,707 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,707 m
- Datum Elevation
- 41.7 m
- Spud Date
- 22/07/1997
- Completion Date
- 08/08/1997
- Permit
- VIC L 13 / L 14
- Rig
- -
Location
- Latitude
- -38.5182
- Longitude
- 147.8390