Skip to content

Ironstone 1

Browse, Northern Territory

Ironstone 1 is a petroleum well in the Browse, Northern Territory, operated by PTTEP, drilled to a total depth of 1,492 m.

Request LAS Files & Well Summary

Well Information

Well Name
Ironstone 1
Basin
Browse
State
Northern Territory
Classification
FEST
Operator
PTTEP
Data Summary
Partial WDS Available

Drilling Data

Total Depth
1,492 m
Datum Elevation
21.5 m
Spud Date
26/09/2011
Completion Date
12/10/2011
Permit
AC-P-40

Location

Latitude
-11.9306
Longitude
125.2724

Available Log Data

4
Log Streams
72
Curves
308,731
Data Points
71,676
Metres

Other (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
A112 947 m 1481 m 533 m
MD 126 m 1491 m 1365 m

Borehole Geometry (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AREA 126 m 1491 m 1365 m
DEVI 126 m 1491 m 1365 m
HAZI 126 m 1491 m 1365 m

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
ADIA 947 m 1465 m 518 m
DCAV 947 m 1465 m 517 m
HORD 947 m 1465 m 518 m
VERD 947 m 1465 m 518 m

Chromato (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 130 m 1492 m 1362 m
FLIN 129 m 1492 m 1362 m
H2S 130 m 1492 m 1362 m
IBUT 130 m 1492 m 1362 m
IPEN 130 m 1492 m 1362 m
MDOU 129 m 1492 m 1362 m
METH 130 m 1492 m 1362 m
MTIN 129 m 1492 m 1362 m
MTOU 129 m 1492 m 1362 m
NBUT 130 m 1492 m 1362 m
NPEN 130 m 1492 m 1362 m
PROP 130 m 1492 m 1362 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 947 m 1465 m 517 m
PEF 947 m 1465 m 517 m
RHOB 947 m 1465 m 517 m

GR (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR_EDTC 83 m 1425 m 1341 m
GR_ARC 931 m 1481 m 549 m
GR_EDTC 83 m 1425 m 1341 m
GRM1 127 m 935 m 807 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CS 83 m 1425 m 1341 m
TENS 83 m 1425 m 1341 m

Miscellaneous (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 129 m 1492 m 1362 m
DEPT 126 m 1491 m 1365 m
DEPT 130 m 1492 m 1362 m
DEPT 83 m 1425 m 1341 m
DEPT 129 m 1492 m 1362 m

Mudlog (15 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
APRS_ARC 126 m 1481 m 1355 m
ATMP 931 m 1481 m 549 m
BITH 129 m 1492 m 1362 m
Dxc 129 m 1492 m 1362 m
ECD_ARC 126 m 1481 m 1355 m
MDIN 129 m 1492 m 1362 m
PVT 129 m 1492 m 1362 m
ROP 129 m 1492 m 1362 m
ROP5 126 m 1491 m 1365 m
RPM 129 m 1492 m 1362 m
SPP 129 m 1492 m 1362 m
TGAS 130 m 1492 m 1362 m
TORQ 129 m 1492 m 1362 m
TREV 129 m 1492 m 1362 m
WOB 129 m 1492 m 1362 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
TNPH 914 m 1463 m 549 m

Resistivity (21 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
A16H 947 m 1481 m 533 m
A16L 947 m 1481 m 533 m
A22H 947 m 1481 m 533 m
A22L 947 m 1481 m 533 m
A28H 947 m 1481 m 533 m
A28L 947 m 1481 m 533 m
A34H 947 m 1481 m 533 m
A34L 947 m 1481 m 533 m
A40H 947 m 1481 m 533 m
A40L 947 m 1481 m 533 m
P16H 947 m 1481 m 533 m
P16L 947 m 1481 m 533 m
P22H 947 m 1481 m 533 m
P22L 947 m 1481 m 533 m
P28H 947 m 1481 m 533 m
P28L 947 m 1481 m 533 m
P34H 947 m 1481 m 533 m
P34L 947 m 1481 m 533 m
P40H 947 m 1481 m 533 m
P40L 947 m 1481 m 533 m
TEMP 126 m 1481 m 1355 m