Skip to content

Chandon 1

Carnarvon, Western Australia

Chandon 1 is a petroleum well in the Carnarvon, Western Australia, operated by Chevron, drilled to a total depth of 3,124 M.

Request LAS Files & Well Summary

Well Information

Well Name
Chandon 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Chevron
Driller
Transocean
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,124 M
Datum Elevation
28.9 m
Spud Date
21/06/2006
Completion Date
11/07/2006
Permit
WA 268 P

Location

Latitude
-19.5756
Longitude
114.1280

Available Log Data

11
Log Streams
171
Curves
1,635,760
Data Points
191,307
Metres

Other (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ADI07 2067 m 3105 m 1038 m
ADI11 2067 m 3105 m 1038 m
ADI15 2067 m 3105 m 1038 m
ADI22 2067 m 3105 m 1038 m
ADI27 2067 m 3105 m 1038 m

Borehole Geometry (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
HAZI 2034 m 3108 m 1074 m
P1AZ 2034 m 3108 m 1074 m
RB 2034 m 3108 m 1074 m
SDEV 2034 m 3108 m 1074 m
TVD 1226 m 3124 m 1898 m

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 2060 m 3083 m 1023 m
CALI 2060 m 3083 m 1023 m
HCAL 2060 m 3100 m 1040 m
HDAR 2062 m 3083 m 1021 m

Chromato (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2077 m 3123 m 1046 m
IBUT 2077 m 3123 m 1046 m
IPEN 2077 m 3123 m 1046 m
MDOU 1226 m 3124 m 1898 m
METH 2077 m 3123 m 1046 m
MTIN 1226 m 3124 m 1898 m
MTOU 1226 m 3124 m 1898 m
NBUT 2077 m 3123 m 1046 m
NPEN 2077 m 3123 m 1046 m
PROP 2077 m 3123 m 1046 m

CMR (27 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2660 m 3066 m 405 m
CBF1 2660 m 3066 m 405 m
CBF2 2660 m 3066 m 405 m
CBF3 2660 m 3066 m 405 m
CBF4 2660 m 3066 m 405 m
CBF5 2660 m 3066 m 405 m
CBF6 2660 m 3066 m 405 m
CBF7 2660 m 3066 m 405 m
CBP1 2660 m 3066 m 405 m
CBP2 2660 m 3066 m 405 m
CBP3 2660 m 3066 m 405 m
CBP4 2660 m 3066 m 405 m
CBP5 2660 m 3066 m 405 m
CBP6 2660 m 3066 m 405 m
CBP7 2660 m 3066 m 405 m
CBP8 2660 m 3066 m 405 m
CFF1 2660 m 3066 m 405 m
CFF2 2660 m 3066 m 405 m
CFF3 2660 m 3066 m 405 m
CFF4 2660 m 3066 m 405 m
CFF5 2660 m 3066 m 405 m
CFF6 2660 m 3066 m 405 m
CFF7 2660 m 3066 m 405 m
CMFF 2660 m 3066 m 405 m
KSDR 2660 m 3066 m 405 m
KTIM 2660 m 3066 m 405 m
TCMR 2660 m 3066 m 405 m

Density (5 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
HDRA 2066 m 3100 m 1034 m
PEF8 2066 m 3100 m 1034 m
PEFZ 2066 m 3100 m 1034 m
RHO8 2066 m 3100 m 1034 m
RHOZ 2066 m 3100 m 1034 m

GR (17 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AGTM 1274 m 3109 m 1834 m
ECGR 2660 m 3066 m 405 m
ECGR 2034 m 3095 m 1061 m
EHGR 2034 m 3095 m 1061 m
GR 2660 m 3066 m 405 m
GR 2034 m 3095 m 1061 m
GR_ARC 1274 m 3108 m 1834 m
HBHK 2034 m 3066 m 1031 m
HCGR 2034 m 3089 m 1055 m
HFK 2034 m 3089 m 1055 m
HGR 2034 m 3095 m 1061 m
HSGR 2034 m 3089 m 1055 m
HTHO 2034 m 3089 m 1055 m
HTPR 2034 m 3089 m 1055 m
HTUR 2034 m 3089 m 1055 m
HURA 2034 m 3089 m 1055 m
TICK_ARC_GR 1275 m 3108 m 1833 m

Logging Parameters (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TENS 2034 m 3108 m 1074 m

Miscellaneous (12 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 1226 m 3124 m 1898 m
DEPTH 1432 m 3079 m 1646 m
DEPTH 2034 m 3108 m 1074 m
DEPTH 2034 m 3108 m 1074 m
DEPTH 2077 m 3123 m 1046 m
DEPTH 1431 m 3108 m 1677 m
DEPTH 2034 m 3108 m 1074 m
DEPTH 2034 m 3108 m 1074 m
DEPTH 1274 m 3124 m 1849 m
DEPTH 1226 m 3124 m 1898 m
MFIN 1226 m 3124 m 1898 m
MFOU 1226 m 3124 m 1898 m

Mudlog (20 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
APRS_ARC 1274 m 3109 m 1835 m
ATMP 1274 m 3109 m 1835 m
BITT 1226 m 3124 m 1898 m
ECD_ARC 1274 m 3109 m 1835 m
HKLD 1226 m 3124 m 1898 m
MDIN 1226 m 3124 m 1898 m
PITV 1226 m 3124 m 1898 m
PPR 1226 m 3124 m 1898 m
ROP 1226 m 3124 m 1898 m
ROP5_RM 1291 m 3124 m 1832 m
RPMAV 1226 m 3124 m 1898 m
RPMM 1226 m 3124 m 1898 m
SPM 1226 m 3124 m 1898 m
TDEP 2660 m 3066 m 405 m
TDEP 2660 m 3066 m 405 m
TGAS 1226 m 3124 m 1898 m
TGAS 2077 m 3123 m 1046 m
TQAV 1226 m 3124 m 1898 m
TQMX 1226 m 3124 m 1898 m
WOB 1226 m 3124 m 1898 m

Neutron (5 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2034 m 3099 m 1065 m
HTNP 2034 m 3099 m 1065 m
HTNP 2034 m 3099 m 1065 m
NPHI 2034 m 3099 m 1065 m
TNPH 2034 m 3099 m 1065 m

Resistivity (43 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
A28H 1274 m 3109 m 1834 m
A34H 1274 m 3109 m 1834 m
A40H 1274 m 3109 m 1834 m
AE10 2067 m 3105 m 1038 m
AE20 2067 m 3105 m 1038 m
AE30 2067 m 3105 m 1038 m
AE60 2067 m 3105 m 1038 m
AE90 2067 m 3105 m 1038 m
AF10 2067 m 3105 m 1038 m
AF20 2067 m 3105 m 1038 m
AF30 2067 m 3105 m 1038 m
AF60 2067 m 3105 m 1038 m
AF90 2067 m 3105 m 1038 m
AO10 2067 m 3105 m 1038 m
AO20 2067 m 3105 m 1038 m
AO30 2067 m 3105 m 1038 m
AO60 2067 m 3105 m 1038 m
AO90 2067 m 3105 m 1038 m
AORT 2067 m 3105 m 1038 m
AORX 2067 m 3105 m 1038 m
AT10 2067 m 3105 m 1038 m
AT20 2067 m 3105 m 1038 m
AT30 2067 m 3105 m 1038 m
AT60 2067 m 3105 m 1038 m
AT90 2067 m 3105 m 1038 m
HTEM 2034 m 3108 m 1074 m
HTEM 2034 m 3108 m 1074 m
P16H 1274 m 3109 m 1834 m
P22H 1274 m 3109 m 1834 m
P28H 1274 m 3109 m 1834 m
P34H 1274 m 3109 m 1834 m
P40H 1274 m 3109 m 1834 m
RT 2067 m 3105 m 1038 m
RT 2066 m 3108 m 1042 m
RWA_HILT 2034 m 3108 m 1074 m
RXO8 2066 m 3100 m 1034 m
RXOZ 2066 m 3100 m 1034 m
SW_HILT 2067 m 3105 m 1038 m
SW_HILT 2034 m 3108 m 1074 m
TAB 1274 m 3109 m 1834 m
TICK_ARC_RES 1275 m 3109 m 1833 m
VCL_HILT 2034 m 3108 m 1074 m
VCL_HILT 2034 m 3108 m 1074 m

Sonic (16 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
CHR2 1582 m 2104 m 522 m
CHRP 1432 m 2103 m 671 m
CHTP 1437 m 2107 m 670 m
DT2R 1582 m 2104 m 522 m
DT2T 1586 m 2107 m 520 m
DTCO 1432 m 3078 m 1646 m
DTCO2 1844 m 3076 m 1232 m
DTCO3 1844 m 3076 m 1232 m
DTCO4 1844 m 3076 m 1232 m
DTRP 1432 m 2103 m 671 m
DTSH5 1431 m 3076 m 1645 m
DTSH6 1431 m 3076 m 1645 m
DTSM 1582 m 3078 m 1496 m
DTTP 1437 m 2107 m 670 m
PR 1582 m 2107 m 525 m
VPVS 1582 m 2107 m 525 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2066 m 3099 m 1033 m