Skip to content

Chandon 2

Carnarvon, Western Australia

Chandon 2 is a petroleum well in the Carnarvon, Western Australia, operated by Chevron, drilled to a total depth of 3,122 m.

Request LAS Files & Well Summary

Well Information

Well Name
Chandon 2
Basin
Carnarvon
State
Western Australia
Classification
FESP
Operator
Chevron
Driller
Ensco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,122 m
Datum Elevation
22.0 m
Spud Date
01/12/2009
Completion Date
27/02/2010
Permit
WA 268 P
Rig
7500

Location

Latitude
-19.5433
Longitude
114.1250

Available Log Data

8
Log Streams
162
Curves
1,213,064
Data Points
187,329
Metres

Other (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
AFOO 2544 m 3124 m 579 m
BFV_HR 2689 m 3121 m 432 m
CMFF_HR 2689 m 3121 m 432 m
HKHT 1190 m 3127 m 1936 m
KSDR_HR 2689 m 3121 m 432 m
KTIM_HR 2689 m 3121 m 432 m
MSE 1190 m 3127 m 1936 m
TAB_RES 1239 m 3121 m 1882 m
TCMR_HR 2689 m 3121 m 432 m

Borehole Geometry (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
HAZI 1167 m 3127 m 1959 m
SDEV 1167 m 3127 m 1959 m
TVD 1190 m 3127 m 1936 m
TVDE 1225 m 3126 m 1901 m

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 2539 m 3095 m 556 m
HDAR 2540 m 3095 m 555 m

Chromato (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1190 m 3127 m 1936 m
FLIN 1190 m 3127 m 1936 m
IBUT 1190 m 3127 m 1936 m
IPEN 1190 m 3127 m 1936 m
MDOU 1190 m 3127 m 1936 m
METH 1190 m 3127 m 1936 m
MTIN 1190 m 3127 m 1936 m
MTOU 1190 m 3127 m 1936 m
NBUT 1190 m 3127 m 1936 m
NPEN 1190 m 3127 m 1936 m
PROP 1190 m 3127 m 1936 m

CMR (27 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2689 m 3121 m 432 m
CBF1 2689 m 3121 m 432 m
CBF2 2689 m 3121 m 432 m
CBF3 2689 m 3121 m 432 m
CBF4 2689 m 3121 m 432 m
CBF5 2689 m 3121 m 432 m
CBF6 2689 m 3121 m 432 m
CBF7 2689 m 3121 m 432 m
CBP1 2689 m 3121 m 432 m
CBP2 2689 m 3121 m 432 m
CBP3 2689 m 3121 m 432 m
CBP4 2689 m 3121 m 432 m
CBP5 2689 m 3121 m 432 m
CBP6 2689 m 3121 m 432 m
CBP7 2689 m 3121 m 432 m
CBP8 2689 m 3121 m 432 m
CFF1 2689 m 3121 m 432 m
CFF2 2689 m 3121 m 432 m
CFF3 2689 m 3121 m 432 m
CFF4 2689 m 3121 m 432 m
CFF5 2689 m 3121 m 432 m
CFF6 2689 m 3121 m 432 m
CFF7 2689 m 3121 m 432 m
CMFF 2689 m 3121 m 432 m
KSDR 2689 m 3121 m 432 m
KTIM 2689 m 3121 m 432 m
TCMR 2689 m 3121 m 432 m

Density (8 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DPH8 2544 m 3095 m 551 m
DPHZ 2544 m 3095 m 551 m
HDRA 2544 m 3095 m 551 m
HPRA 2544 m 3095 m 551 m
PEF8 2544 m 3095 m 551 m
PEFZ 2544 m 3095 m 551 m
RHO8 2544 m 3095 m 551 m
RHOZ 2544 m 3095 m 551 m

GR (15 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 1167 m 3091 m 1923 m
ECGR_EDTC 2540 m 3088 m 548 m
EHGR 2540 m 3087 m 547 m
EHGR_EDTC 2540 m 3087 m 547 m
GR 1167 m 3091 m 1923 m
GR_EDTC 2540 m 3088 m 548 m
GR1 1225 m 3121 m 1896 m
HBHK 1167 m 3029 m 1861 m
HCGR 1167 m 3088 m 1921 m
HFK 1167 m 3088 m 1921 m
HGR 2540 m 3087 m 547 m
HGR_EDTC 2540 m 3087 m 547 m
HSGR 1167 m 3088 m 1921 m
HTHO 1167 m 3088 m 1921 m
HURA 1167 m 3088 m 1921 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CS 1167 m 3127 m 1959 m
TENS 1167 m 3127 m 1959 m

Miscellaneous (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 1190 m 3127 m 1936 m
DEPT 1167 m 3127 m 1959 m
DEPT 1225 m 3126 m 1901 m
DEPT 1190 m 3127 m 1936 m
DEPT 2539 m 3095 m 556 m
DEPT 2544 m 3124 m 579 m
DEPT 2689 m 3121 m 432 m
DEPT 1190 m 3127 m 1936 m
DEPT 2540 m 3095 m 555 m

Mudlog (18 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 1190 m 3127 m 1936 m
DHAP 1225 m 3122 m 1897 m
DHAT 1225 m 3121 m 1896 m
DXC 1190 m 3127 m 1936 m
ECD 1225 m 3122 m 1897 m
HKLD 1190 m 3127 m 1936 m
MDIN 1190 m 3127 m 1936 m
PVT 1190 m 3127 m 1936 m
ROP 1190 m 3127 m 1936 m
ROP5 1225 m 3126 m 1901 m
RPM 1190 m 3127 m 1936 m
SPP 1190 m 3127 m 1936 m
TGAS 1190 m 3127 m 1936 m
TORQ 1190 m 3127 m 1936 m
TQMN 1190 m 3127 m 1936 m
TQMX 1190 m 3127 m 1936 m
TREV 1190 m 3127 m 1936 m
WOB 1190 m 3127 m 1936 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2540 m 3093 m 553 m
HTNP 2540 m 3093 m 553 m
NPHI 1167 m 3094 m 1926 m
TNPH 1167 m 3094 m 1926 m

Resistivity (48 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
A16H 1225 m 3121 m 1896 m
A16L 1225 m 3121 m 1896 m
A22H 1225 m 3121 m 1896 m
A22L 1225 m 3121 m 1896 m
A28H 1225 m 3121 m 1896 m
A28L 1225 m 3121 m 1896 m
A34H 1225 m 3121 m 1896 m
A34L 1225 m 3121 m 1896 m
A40H 1225 m 3121 m 1896 m
A40L 1225 m 3121 m 1896 m
AE10 2544 m 3124 m 579 m
AE20 2544 m 3124 m 579 m
AE30 2544 m 3124 m 579 m
AE60 2544 m 3124 m 579 m
AE90 2544 m 3124 m 579 m
AF10 2544 m 3124 m 579 m
AF20 2544 m 3124 m 579 m
AF30 2544 m 3124 m 579 m
AF60 2544 m 3124 m 579 m
AF90 2544 m 3124 m 579 m
AFD1 2544 m 3124 m 579 m
AFD2 2544 m 3124 m 579 m
AFRT 2544 m 3124 m 579 m
AFRX 2544 m 3124 m 579 m
AT10 2544 m 3124 m 579 m
AT20 2544 m 3124 m 579 m
AT30 2544 m 3124 m 579 m
AT60 2544 m 3124 m 579 m
AT90 2544 m 3124 m 579 m
ATRT 2544 m 3124 m 579 m
ATRX 2544 m 3124 m 579 m
HMIN 2544 m 3095 m 551 m
HMNO 2544 m 3095 m 551 m
HTEM 2540 m 3127 m 587 m
P16H 1225 m 3121 m 1896 m
P16L 1225 m 3121 m 1896 m
P22H 1225 m 3121 m 1896 m
P22L 1225 m 3121 m 1896 m
P28H 1225 m 3121 m 1896 m
P28L 1225 m 3121 m 1896 m
P34H 1225 m 3121 m 1896 m
P34L 1225 m 3121 m 1896 m
P40H 1225 m 3121 m 1896 m
P40L 1225 m 3121 m 1896 m
RSO8 2544 m 3095 m 551 m
RSOZ 2544 m 3095 m 551 m
RXO8 2544 m 3095 m 551 m
RXOZ 2544 m 3095 m 551 m

Sonic (5 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 2543 m 3108 m 565 m
DTSM 2585 m 3108 m 523 m
DTST 2543 m 3108 m 565 m
PR 2585 m 3108 m 523 m
VPVS 2585 m 3108 m 523 m