Skip to content

Furness 1

Carnarvon, Western Australia

Furness 1 is a petroleum well in the Carnarvon, Western Australia, operated by BHP, drilled to a total depth of 2,709 m.

Request LAS Files & Well Summary

Well Information

Well Name
Furness 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
BHP
Driller
Diamond
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,709 m
Datum Elevation
22.2 m
Spud Date
01/07/2010
Completion Date
15/07/2010
Permit
WA 255 P

Location

Latitude
-21.4050
Longitude
113.9330

Available Log Data

7
Log Streams
78
Curves
899,542
Data Points
136,616
Metres

Other (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CRM 628 m 2710 m 2082 m
DEPT 599 m 2625 m 2025 m
DEPT 1305 m 2689 m 1384 m
DEPT 1325 m 2674 m 1349 m
DEPT 628 m 2710 m 2082 m
DEPT 628 m 2711 m 2083 m
DEPT 1305 m 2689 m 1384 m
DEPT 628 m 2710 m 2082 m
MR 628 m 2710 m 2082 m
TAB_RES 673 m 2695 m 2021 m

Borehole Geometry (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 1305 m 2689 m 1384 m
HAZI 1305 m 2689 m 1384 m
P1AZ 1305 m 2689 m 1384 m
RB 1305 m 2689 m 1384 m
TVD 628 m 2710 m 2082 m
TVD 628 m 2711 m 2083 m

Caliper (3 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALC 628 m 2710 m 2082 m
DCAV 1331 m 2679 m 1347 m
HDAR 1335 m 2674 m 1339 m

Chromato (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 628 m 2710 m 2082 m
FLIN 628 m 2710 m 2082 m
IBUT 628 m 2710 m 2082 m
IPEN 628 m 2710 m 2082 m
METH 628 m 2710 m 2082 m
NBUT 628 m 2710 m 2082 m
NPEN 628 m 2710 m 2082 m
PROP 628 m 2710 m 2082 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 1331 m 2679 m 1347 m
PEF 1331 m 2679 m 1347 m
RHOB 1331 m 2679 m 1347 m

Dip and Scan (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DPAZ 1345 m 2684 m 1339 m
DPTR 1345 m 2684 m 1339 m
QUAF 1345 m 2685 m 1340 m

GR (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR_EDTC 599 m 2618 m 2018 m
ECGR_EDTC 1305 m 2661 m 1355 m
GR 665 m 2695 m 2030 m
GR_EDTC 599 m 2618 m 2018 m
GR_EDTC 1325 m 2674 m 1349 m
GR_EDTC 1305 m 2661 m 1355 m

Logging Parameters (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CS 599 m 2625 m 2025 m
CS 1305 m 2674 m 1369 m
TENS 599 m 2625 m 2025 m
TENS 1305 m 2689 m 1384 m

MUD (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
C1 1305 m 2689 m 1384 m
C2 1305 m 2689 m 1384 m

Mudlog (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DHAP 665 m 2695 m 2029 m
DHAT 665 m 2695 m 2030 m
DOLO 628 m 2710 m 2082 m
ECD 665 m 2695 m 2029 m
ROP 628 m 2710 m 2082 m
ROP5 628 m 2711 m 2082 m
RPM 628 m 2710 m 2082 m
RPM 628 m 2711 m 2083 m
SPP 628 m 2710 m 2082 m
TGAS 628 m 2710 m 2082 m
TORQ 628 m 2710 m 2082 m
TQMX 628 m 2710 m 2082 m
WOB 628 m 2710 m 2082 m
WOH 628 m 2710 m 2082 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
TNPH 1329 m 2677 m 1347 m

Resistivity (7 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
A28H 673 m 2695 m 2021 m
A40H 673 m 2695 m 2021 m
P16H 673 m 2695 m 2021 m
P22H 673 m 2695 m 2021 m
P28H 673 m 2695 m 2021 m
P34H 673 m 2695 m 2021 m
P40H 673 m 2695 m 2021 m

Sonic (9 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 1357 m 2671 m 1313 m
DTCO 1330 m 2675 m 1344 m
DTSM 1357 m 2671 m 1313 m
DTSM 1330 m 2675 m 1344 m
PR 1358 m 2671 m 1313 m
PR 1340 m 2675 m 1334 m
SPHI 1330 m 2675 m 1344 m
VPVS 1358 m 2671 m 1313 m
VPVS 1340 m 2675 m 1334 m

WL (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
HD1_PPC1 1325 m 2674 m 1349 m
HD2_PPC1 1325 m 2674 m 1349 m