Skip to content

Glenloth 1 - Car

Carnarvon, Western Australia

Glenloth 1 - Car is a petroleum well in the Carnarvon, Western Australia, operated by Hess, drilled to a total depth of 5,018 m.

Request LAS Files & Well Summary

Well Information

Well Name
Glenloth 1 - Car
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Hess
Driller
TransOcean
Data Summary
Partial WDS Available

Drilling Data

Total Depth
5,018 m
Datum Elevation
29.0 m
Spud Date
19/02/2010
Completion Date
01/05/2010
Permit
WA 390 P

Location

Latitude
-20.0733
Longitude
113.7790

Comments

Well has same name as Glenloth 1 in Surat basin

Available Log Data

5
Log Streams
89
Curves
1,808,790
Data Points
253,298
Metres

Other (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 2401 m 5018 m 2617 m
DEPT 1105 m 5033 m 3928 m
DEPT 1146 m 5018 m 3872 m
DEPT 2380 m 5016 m 2636 m
DEPT 2380 m 5020 m 2640 m
POIRX 2704 m 5006 m 2302 m
VPVSX 4638 m 5006 m 367 m

Caliper (3 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CAL 2382 m 5000 m 2618 m
CALFM 2380 m 4617 m 2237 m
CALX 2380 m 5000 m 2620 m

Chromato (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2401 m 5018 m 2617 m
FLIN 1146 m 5018 m 3872 m
IBUT 2401 m 5018 m 2617 m
IPEN 2401 m 5018 m 2617 m
MDOU 1146 m 5018 m 3872 m
METH 2401 m 5018 m 2617 m
MTIN 1146 m 5018 m 3872 m
MTOU 1146 m 5018 m 3872 m
NBUT 2401 m 5018 m 2617 m
NPEN 2401 m 5018 m 2617 m
PROP 2401 m 5018 m 2617 m

Density (6 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
BDCFM 2386 m 4617 m 2230 m
DPEFM 2386 m 4617 m 2230 m
DRHFM 2386 m 4617 m 2230 m
ZCOR 2386 m 5000 m 2613 m
ZDEN 2334 m 5000 m 2665 m
ZDNC 2386 m 5000 m 2613 m

GR (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 1105 m 4995 m 3890 m
GRD 2380 m 5006 m 2626 m
GRSL 2334 m 4995 m 2660 m
KAPI 2334 m 4994 m 2660 m
KTH 2334 m 4994 m 2660 m
THAPI 2334 m 4994 m 2660 m
UAPI 2334 m 4994 m 2660 m

Logging Parameters (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CHT 1131 m 5033 m 3901 m

Miscellaneous (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ACTECDM 2387 m 5020 m 2633 m
SPD 2338 m 5033 m 2695 m

Mudlog (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 1146 m 5018 m 3872 m
DXC 1146 m 5018 m 3872 m
ECD 1146 m 5018 m 3872 m
MDIN 1146 m 5018 m 3872 m
RETD 1146 m 5018 m 3872 m
ROP 2380 m 4986 m 2605 m
RPMB 1146 m 5018 m 3872 m
RPMS 1146 m 5018 m 3872 m
SPP 1146 m 5018 m 3872 m
TGAS 2401 m 5018 m 2617 m
TORQ 1146 m 5018 m 3872 m
TQMX 1146 m 5018 m 3872 m
TREV 1146 m 5018 m 3872 m
WOB 1146 m 5018 m 3872 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
CNCF 2334 m 4997 m 2662 m
NPLFM 2386 m 4705 m 2318 m

Resistivity (27 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
M0R1 2386 m 5016 m 2629 m
M0R2 2386 m 5016 m 2629 m
M0R3 2386 m 5016 m 2629 m
M0R6 2386 m 5016 m 2629 m
M0R9 2386 m 5016 m 2629 m
M0RX 2386 m 5016 m 2629 m
M1R1 2386 m 5016 m 2629 m
M1R2 2386 m 5016 m 2629 m
M1R3 2386 m 5016 m 2629 m
M1R6 2386 m 5016 m 2629 m
M1R9 2386 m 5016 m 2629 m
M1RX 2386 m 5016 m 2629 m
M2R1 2386 m 5016 m 2629 m
M2R2 2386 m 5016 m 2629 m
M2R3 2386 m 5016 m 2629 m
M2R6 2386 m 5016 m 2629 m
M2R9 2386 m 5016 m 2629 m
M2RX 2386 m 5016 m 2629 m
M4R1 2386 m 5016 m 2629 m
RACHM 2386 m 5009 m 2622 m
RACLM 2386 m 5009 m 2622 m
RPCHM 2386 m 5009 m 2622 m
RPCLM 2386 m 5009 m 2622 m
RPTHM 2386 m 5009 m 2622 m
TCDM 2388 m 5020 m 2632 m
WRM 2334 m 4988 m 2653 m
WTBH 2334 m 4988 m 2653 m

Sonic (5 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT24 2380 m 5015 m 2635 m
DT24S 4632 m 5015 m 382 m
DTC 2383 m 5016 m 2633 m
DTST 2383 m 5016 m 2632 m
DTXX 2704 m 5006 m 2302 m

WL (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR1 2380 m 5006 m 2626 m
GR2 2380 m 5006 m 2626 m
PE 2386 m 5000 m 2613 m
ROP1 1146 m 5018 m 3872 m