Hampton 1
Hampton 1 is a petroleum well in the Carnarvon, Western Australia, operated by Woodside, drilled to a total depth of 2,584 m.
Well Information
Drilling Data
- Total Depth
- 2,584 m
- Datum Elevation
- 30.0 m
- Spud Date
- 22/03/1974
- Completion Date
- 22/04/1974
- Permit
- WA 1 P
- Rig
- Ocean Digger
Location
- Latitude
- -20.1179
- Longitude
- 116.5460
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 402 m | 2559 m | 2157 m |
Density (2 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| DRHO | 397 m | 2563 m | 2165 m |
| RHOB | 399 m | 2563 m | 2164 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 45 m | 2565 m | 2520 m |
Miscellaneous (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 45 m | 2566 m | 2521 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPHI | 402 m | 2566 m | 2163 m |
Resistivity (3 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| LLD | 402 m | 2555 m | 2153 m |
| LLS | 402 m | 2555 m | 2153 m |
| RXO | 402 m | 1199 m | 797 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 402 m | 2556 m | 2153 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 402 m | 2562 m | 2159 m |