Digital Wireline Logs for Hurricane 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Hurricane 3 in the Carnarvon, Western Australia, operated by Santos, drilled to a total depth of 3,158 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,158 M
- Datum Elevation
- -999.2 m
- Spud Date
- 10/11/2012
- Completion Date
- 05/12/2012
- Permit
- WA 48 R
- Rig
- Rig 104
Location
- Latitude
- -19.6836
- Longitude
- 116.6310