Macedon 6
Macedon 6 is a petroleum well in the Carnarvon, Western Australia, operated by BHP Billiton, drilled to a total depth of 1,005 m.
Well Information
- Well Name
- Macedon 6
- Basin
- Carnarvon
- State
- Western Australia
- Classification
- -
- Operator
- BHP Billiton
- Driller
- Diamond
- Data Summary
- Partial WDS Available
Drilling Data
- Total Depth
- 1,005 m
- Datum Elevation
- 22.2 m
- Spud Date
- 11/06/2009
- Completion Date
- 03/07/2009
- Permit
- WA-42-L
- Rig
- Ocean Epoch
Location
- Latitude
- -21.5676
- Longitude
- 114.1670
Available Log Data
Borehole Geometry (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| TVD | 202 m | 1005 m | 803 m |
Caliper (2 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALC | 202 m | 1005 m | 803 m |
| DCAV | 947 m | 1001 m | 53 m |
Chromato (8 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 202 m | 1005 m | 803 m |
| FLIN | 202 m | 1005 m | 803 m |
| IBUT | 202 m | 1005 m | 803 m |
| IPEN | 202 m | 1005 m | 803 m |
| METH | 202 m | 1005 m | 803 m |
| NBUT | 202 m | 1005 m | 803 m |
| NPEN | 202 m | 1005 m | 803 m |
| PROP | 202 m | 1005 m | 803 m |
Density (3 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| DRHO | 947 m | 1001 m | 53 m |
| PEB | 947 m | 1001 m | 53 m |
| RHOB | 947 m | 1001 m | 53 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 201 m | 1001 m | 799 m |
Miscellaneous (3 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 201 m | 1005 m | 803 m |
| DEPT | 202 m | 1005 m | 803 m |
| DEPT | 202 m | 1005 m | 803 m |
Mudlog (14 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DHAP | 732 m | 1002 m | 269 m |
| DHAT | 732 m | 1002 m | 270 m |
| DOLO | 202 m | 1005 m | 803 m |
| ECD | 732 m | 1002 m | 269 m |
| HKLD | 202 m | 1005 m | 803 m |
| ROP | 202 m | 1005 m | 803 m |
| ROP5 | 210 m | 1005 m | 794 m |
| RPM | 210 m | 1005 m | 794 m |
| RPM | 202 m | 1005 m | 803 m |
| SPP | 202 m | 1005 m | 803 m |
| TGAS | 202 m | 1005 m | 803 m |
| TORQ | 202 m | 1005 m | 803 m |
| TQMX | 202 m | 1005 m | 803 m |
| WOB | 202 m | 1005 m | 803 m |
Neutron (1 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| TNPH | 945 m | 998 m | 52 m |
Resistivity (9 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| A28H | 748 m | 999 m | 251 m |
| A40H | 748 m | 999 m | 251 m |
| P16H | 748 m | 999 m | 251 m |
| P22H | 748 m | 999 m | 251 m |
| P28H | 748 m | 999 m | 251 m |
| P34H | 748 m | 999 m | 251 m |
| P40H | 748 m | 999 m | 251 m |
| RES | 202 m | 1005 m | 803 m |
| RESC | 202 m | 1005 m | 803 m |