Skip to content

Pluto 2 Corehole

Carnarvon, Western Australia

Pluto 2 Corehole is a petroleum well in the Carnarvon, Western Australia, operated by Woodside, drilled to a total depth of 3,405 m.

Request LAS Files & Well Summary

Well Information

Well Name
Pluto 2 Corehole
Basin
Carnarvon
State
Western Australia
Classification
FEFE
Operator
Woodside
Driller
Transocean
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,405 m
Datum Elevation
26.4 m
Spud Date
27/07/2005
Completion Date
23/08/2005
Permit
WA 350 P
Rig
Sedco 703

Location

Latitude
-19.9517
Longitude
115.1340

Comments

Includes Pluto 2

Available Log Data

14
Log Streams
205
Curves
2,002,043
Data Points
246,765
Metres

Other (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
C02 388 m 3334 m 2946 m
C02 2446 m 3404 m 958 m
CORE_GR 3091 m 3214 m 123 m
CORE_GR 3091 m 3213 m 122 m

Borehole Geometry (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 2010 m 3316 m 1306 m
DEVI 2338 m 3339 m 1000 m
HAZI 2010 m 3316 m 1306 m
HAZI 2338 m 3339 m 1000 m
P1AZ 2010 m 3316 m 1306 m
P1AZ 2338 m 3339 m 1000 m
RB 2278 m 3316 m 1038 m
RB 2338 m 3339 m 1000 m
SDEV 2278 m 3316 m 1038 m

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HDAR 2350 m 3312 m 962 m
HDAR 2395 m 3339 m 944 m
HDAR 2396 m 3399 m 1003 m
SHSI 2444 m 3328 m 883 m

Chromato (20 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2395 m 3312 m 917 m
ETHA 388 m 3334 m 2946 m
ETHA 2395 m 3336 m 941 m
ETHA 2446 m 3404 m 958 m
H2S 388 m 3334 m 2946 m
H2S 2446 m 3404 m 958 m
IBUT 388 m 3334 m 2946 m
IBUT 2446 m 3404 m 958 m
IPEN 388 m 3334 m 2946 m
IPEN 2446 m 3404 m 958 m
METH 2395 m 3312 m 917 m
METH 388 m 3334 m 2946 m
METH 2395 m 3336 m 941 m
METH 2446 m 3404 m 958 m
NBUT 388 m 3334 m 2946 m
NBUT 2446 m 3404 m 958 m
NPEN 388 m 3334 m 2946 m
NPEN 2446 m 3404 m 958 m
PROP 388 m 3334 m 2946 m
PROP 2446 m 3404 m 958 m

CMR (29 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 3025 m 3397 m 372 m
CBF1 3025 m 3397 m 372 m
CBF2 3025 m 3397 m 372 m
CBF3 3025 m 3397 m 372 m
CBF4 3025 m 3397 m 372 m
CBF5 3025 m 3397 m 372 m
CBF6 3025 m 3397 m 372 m
CBF7 3025 m 3397 m 372 m
CBP1 3025 m 3397 m 372 m
CBP2 3025 m 3397 m 372 m
CBP3 3025 m 3397 m 372 m
CBP4 3025 m 3397 m 372 m
CBP5 3025 m 3397 m 372 m
CBP6 3025 m 3397 m 372 m
CBP7 3025 m 3397 m 372 m
CBP8 3025 m 3397 m 372 m
CFF1 3025 m 3397 m 372 m
CFF2 3025 m 3397 m 372 m
CFF3 3025 m 3397 m 372 m
CFF4 3025 m 3397 m 372 m
CFF5 3025 m 3397 m 372 m
CFF6 3025 m 3397 m 372 m
CFF7 3025 m 3397 m 372 m
IPERM 3025 m 3397 m 372 m
IPOR 3025 m 3397 m 372 m
KSDR 3025 m 3397 m 372 m
KTIM 3025 m 3397 m 372 m
T12R 3025 m 3397 m 372 m
TCMR 3025 m 3397 m 372 m

Density (21 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
HDRA 2350 m 3387 m 1037 m
HPRA 2350 m 3387 m 1037 m
NUCL 2350 m 3322 m 972 m
PEF8 2350 m 3387 m 1037 m
PEFZ 2350 m 3387 m 1037 m
RHO8 2350 m 3387 m 1037 m
RHOZ 2350 m 3387 m 1037 m
SAFC 2348 m 3322 m 974 m
SANC 2348 m 3322 m 974 m
SBD2 2444 m 3328 m 883 m
SBD3 2444 m 3328 m 883 m
SBDC 2444 m 3328 m 883 m
SCO2 2444 m 3328 m 883 m
SCO3 2444 m 3328 m 883 m
SCOR 2444 m 3328 m 883 m
SFB2 2444 m 3328 m 883 m
SFBD 2444 m 3328 m 883 m
SNB2 2444 m 3328 m 883 m
SNBD 2444 m 3328 m 883 m
SNP2 2444 m 3328 m 883 m
SNPE 2444 m 3328 m 883 m

Dip and Scan (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DDA 2334 m 3313 m 979 m
DDA 2397 m 3335 m 937 m
DDIP 2334 m 3313 m 979 m
DDIP 2397 m 3335 m 937 m

GR (26 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 2275 m 3394 m 1119 m
EHGR 2275 m 3394 m 1119 m
GR 3025 m 3396 m 371 m
GR 2275 m 3394 m 1119 m
HBHK 2012 m 3236 m 1224 m
HBHK 2338 m 3270 m 931 m
HCGR 2012 m 3292 m 1280 m
HCGR 2338 m 3312 m 974 m
HFK 2012 m 3292 m 1280 m
HFK 2338 m 3312 m 974 m
HGR 2275 m 3394 m 1119 m
HSGR 2012 m 3292 m 1280 m
HSGR 2338 m 3312 m 974 m
HTHO 2012 m 3292 m 1280 m
HTHO 2338 m 3312 m 974 m
HURA 2012 m 3292 m 1280 m
HURA 2338 m 3312 m 974 m
SGRA 2444 m 3401 m 957 m
SGRA 425 m 3331 m 2906 m
SGRA 2444 m 3401 m 957 m
SGRB 2444 m 3401 m 957 m
SGRB 425 m 3331 m 2906 m
SGRB 2444 m 3401 m 957 m
SGRC 2444 m 3401 m 957 m
SGRC 425 m 3331 m 2906 m
SGRC 2444 m 3401 m 957 m

Logging Parameters (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TENS 2277 m 3316 m 1038 m
TENS 2338 m 3339 m 1000 m
TENS 3025 m 3411 m 385 m
TENS 2240 m 3414 m 1173 m

Miscellaneous (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 2444 m 3401 m 957 m
DEPTH 425 m 3335 m 2910 m
DEPTH 2442 m 3405 m 962 m
DEPTH 388 m 3334 m 2946 m
DEPTH 2446 m 3404 m 958 m
DEPTH 3091 m 3213 m 122 m
MFIN 388 m 3334 m 2946 m
MFIN 2446 m 3404 m 958 m

Mudlog (22 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 388 m 3334 m 2946 m
ROP 2446 m 3404 m 958 m
RPM 388 m 3334 m 2946 m
RPM 2446 m 3404 m 958 m
SPP 388 m 3334 m 2946 m
SPP 2446 m 3404 m 958 m
SROP 425 m 3335 m 2909 m
SROP 2444 m 3405 m 961 m
TDEP 2277 m 3320 m 1042 m
TDEP 2338 m 3339 m 1000 m
TDEP 3025 m 3411 m 385 m
TDEP 2010 m 3317 m 1307 m
TDEP 2338 m 3339 m 1000 m
TDEP 3025 m 3411 m 385 m
TDEP 2240 m 3414 m 1173 m
TDEP 2240 m 3414 m 1173 m
TGAS 388 m 3334 m 2946 m
TGAS 2446 m 3404 m 958 m
TORQ 388 m 3334 m 2946 m
TORQ 2446 m 3404 m 958 m
WOB 388 m 3334 m 2946 m
WOB 2446 m 3404 m 958 m

Neutron (4 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2277 m 3396 m 1119 m
HTNP 2277 m 3396 m 1119 m
NPHI 2276 m 3397 m 1121 m
TNPH 2276 m 3397 m 1121 m

Resistivity (36 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
DI 2355 m 3394 m 1039 m
HMIN 2355 m 3394 m 1039 m
HMNO 2355 m 3394 m 1039 m
HTEM 2240 m 3414 m 1173 m
RLA0 2355 m 3394 m 1039 m
RLA1 2355 m 3394 m 1039 m
RLA2 2355 m 3394 m 1039 m
RLA3 2355 m 3394 m 1039 m
RLA4 2355 m 3394 m 1039 m
RLA5 2355 m 3394 m 1039 m
RM 2355 m 3394 m 1039 m
RT 2355 m 3394 m 1039 m
RXO 2355 m 3394 m 1039 m
RXOZ 2240 m 3414 m 1173 m
SDDE 425 m 3325 m 2899 m
SDDE 2444 m 3399 m 955 m
SEDA 425 m 3325 m 2900 m
SEDA 2444 m 3399 m 955 m
SEDP 425 m 3325 m 2900 m
SEDP 2444 m 3399 m 955 m
SEMA 425 m 3325 m 2900 m
SEMA 2444 m 3399 m 955 m
SEMP 425 m 3325 m 2900 m
SEMP 2444 m 3399 m 955 m
SESA 425 m 3325 m 2900 m
SESA 2444 m 3399 m 955 m
SESP 425 m 3325 m 2900 m
SESP 2444 m 3399 m 955 m
SEXA 425 m 3325 m 2900 m
SEXA 2444 m 3399 m 955 m
SEXP 425 m 3325 m 2900 m
SEXP 2444 m 3399 m 955 m
SFXE 425 m 3325 m 2900 m
SFXE 2444 m 3399 m 955 m
STEM 425 m 3325 m 2900 m
STEM 2444 m 3399 m 955 m

Sonic (13 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 2282 m 3299 m 1017 m
DT 2355 m 3324 m 969 m
DT2 2355 m 3324 m 969 m
DT4P 2355 m 3324 m 969 m
DT4S 2282 m 3299 m 1017 m
DT4S 2355 m 3324 m 969 m
DT5 2282 m 3299 m 1017 m
DTCO 2282 m 3299 m 1017 m
DTCO 2355 m 3324 m 969 m
DTSM 2282 m 3299 m 1017 m
DTSM 2355 m 3324 m 969 m
PR 2355 m 3324 m 969 m
VPVS 2355 m 3324 m 969 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2355 m 3399 m 1044 m