Pluto 2 Corehole
Pluto 2 Corehole is a petroleum well in the Carnarvon, Western Australia, operated by Woodside, drilled to a total depth of 3,405 m.
Well Information
- Well Name
- Pluto 2 Corehole
- Basin
- Carnarvon
- State
- Western Australia
- Classification
- FEFE
- Operator
- Woodside
- Driller
- Transocean
- Data Summary
- Partial WDS Available
Drilling Data
- Total Depth
- 3,405 m
- Datum Elevation
- 26.4 m
- Spud Date
- 27/07/2005
- Completion Date
- 23/08/2005
- Permit
- WA 350 P
- Rig
- Sedco 703
Location
- Latitude
- -19.9517
- Longitude
- 115.1340
Comments
Includes Pluto 2
Available Log Data
Other (4 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| C02 | 388 m | 3334 m | 2946 m |
| C02 | 2446 m | 3404 m | 958 m |
| CORE_GR | 3091 m | 3214 m | 123 m |
| CORE_GR | 3091 m | 3213 m | 122 m |
Borehole Geometry (9 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEVI | 2010 m | 3316 m | 1306 m |
| DEVI | 2338 m | 3339 m | 1000 m |
| HAZI | 2010 m | 3316 m | 1306 m |
| HAZI | 2338 m | 3339 m | 1000 m |
| P1AZ | 2010 m | 3316 m | 1306 m |
| P1AZ | 2338 m | 3339 m | 1000 m |
| RB | 2278 m | 3316 m | 1038 m |
| RB | 2338 m | 3339 m | 1000 m |
| SDEV | 2278 m | 3316 m | 1038 m |
Caliper (4 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| HDAR | 2350 m | 3312 m | 962 m |
| HDAR | 2395 m | 3339 m | 944 m |
| HDAR | 2396 m | 3399 m | 1003 m |
| SHSI | 2444 m | 3328 m | 883 m |
Chromato (20 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 2395 m | 3312 m | 917 m |
| ETHA | 388 m | 3334 m | 2946 m |
| ETHA | 2395 m | 3336 m | 941 m |
| ETHA | 2446 m | 3404 m | 958 m |
| H2S | 388 m | 3334 m | 2946 m |
| H2S | 2446 m | 3404 m | 958 m |
| IBUT | 388 m | 3334 m | 2946 m |
| IBUT | 2446 m | 3404 m | 958 m |
| IPEN | 388 m | 3334 m | 2946 m |
| IPEN | 2446 m | 3404 m | 958 m |
| METH | 2395 m | 3312 m | 917 m |
| METH | 388 m | 3334 m | 2946 m |
| METH | 2395 m | 3336 m | 941 m |
| METH | 2446 m | 3404 m | 958 m |
| NBUT | 388 m | 3334 m | 2946 m |
| NBUT | 2446 m | 3404 m | 958 m |
| NPEN | 388 m | 3334 m | 2946 m |
| NPEN | 2446 m | 3404 m | 958 m |
| PROP | 388 m | 3334 m | 2946 m |
| PROP | 2446 m | 3404 m | 958 m |
CMR (29 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| BFV | 3025 m | 3397 m | 372 m |
| CBF1 | 3025 m | 3397 m | 372 m |
| CBF2 | 3025 m | 3397 m | 372 m |
| CBF3 | 3025 m | 3397 m | 372 m |
| CBF4 | 3025 m | 3397 m | 372 m |
| CBF5 | 3025 m | 3397 m | 372 m |
| CBF6 | 3025 m | 3397 m | 372 m |
| CBF7 | 3025 m | 3397 m | 372 m |
| CBP1 | 3025 m | 3397 m | 372 m |
| CBP2 | 3025 m | 3397 m | 372 m |
| CBP3 | 3025 m | 3397 m | 372 m |
| CBP4 | 3025 m | 3397 m | 372 m |
| CBP5 | 3025 m | 3397 m | 372 m |
| CBP6 | 3025 m | 3397 m | 372 m |
| CBP7 | 3025 m | 3397 m | 372 m |
| CBP8 | 3025 m | 3397 m | 372 m |
| CFF1 | 3025 m | 3397 m | 372 m |
| CFF2 | 3025 m | 3397 m | 372 m |
| CFF3 | 3025 m | 3397 m | 372 m |
| CFF4 | 3025 m | 3397 m | 372 m |
| CFF5 | 3025 m | 3397 m | 372 m |
| CFF6 | 3025 m | 3397 m | 372 m |
| CFF7 | 3025 m | 3397 m | 372 m |
| IPERM | 3025 m | 3397 m | 372 m |
| IPOR | 3025 m | 3397 m | 372 m |
| KSDR | 3025 m | 3397 m | 372 m |
| KTIM | 3025 m | 3397 m | 372 m |
| T12R | 3025 m | 3397 m | 372 m |
| TCMR | 3025 m | 3397 m | 372 m |
Density (21 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| HDRA | 2350 m | 3387 m | 1037 m |
| HPRA | 2350 m | 3387 m | 1037 m |
| NUCL | 2350 m | 3322 m | 972 m |
| PEF8 | 2350 m | 3387 m | 1037 m |
| PEFZ | 2350 m | 3387 m | 1037 m |
| RHO8 | 2350 m | 3387 m | 1037 m |
| RHOZ | 2350 m | 3387 m | 1037 m |
| SAFC | 2348 m | 3322 m | 974 m |
| SANC | 2348 m | 3322 m | 974 m |
| SBD2 | 2444 m | 3328 m | 883 m |
| SBD3 | 2444 m | 3328 m | 883 m |
| SBDC | 2444 m | 3328 m | 883 m |
| SCO2 | 2444 m | 3328 m | 883 m |
| SCO3 | 2444 m | 3328 m | 883 m |
| SCOR | 2444 m | 3328 m | 883 m |
| SFB2 | 2444 m | 3328 m | 883 m |
| SFBD | 2444 m | 3328 m | 883 m |
| SNB2 | 2444 m | 3328 m | 883 m |
| SNBD | 2444 m | 3328 m | 883 m |
| SNP2 | 2444 m | 3328 m | 883 m |
| SNPE | 2444 m | 3328 m | 883 m |
Dip and Scan (4 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DDA | 2334 m | 3313 m | 979 m |
| DDA | 2397 m | 3335 m | 937 m |
| DDIP | 2334 m | 3313 m | 979 m |
| DDIP | 2397 m | 3335 m | 937 m |
GR (26 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ECGR | 2275 m | 3394 m | 1119 m |
| EHGR | 2275 m | 3394 m | 1119 m |
| GR | 3025 m | 3396 m | 371 m |
| GR | 2275 m | 3394 m | 1119 m |
| HBHK | 2012 m | 3236 m | 1224 m |
| HBHK | 2338 m | 3270 m | 931 m |
| HCGR | 2012 m | 3292 m | 1280 m |
| HCGR | 2338 m | 3312 m | 974 m |
| HFK | 2012 m | 3292 m | 1280 m |
| HFK | 2338 m | 3312 m | 974 m |
| HGR | 2275 m | 3394 m | 1119 m |
| HSGR | 2012 m | 3292 m | 1280 m |
| HSGR | 2338 m | 3312 m | 974 m |
| HTHO | 2012 m | 3292 m | 1280 m |
| HTHO | 2338 m | 3312 m | 974 m |
| HURA | 2012 m | 3292 m | 1280 m |
| HURA | 2338 m | 3312 m | 974 m |
| SGRA | 2444 m | 3401 m | 957 m |
| SGRA | 425 m | 3331 m | 2906 m |
| SGRA | 2444 m | 3401 m | 957 m |
| SGRB | 2444 m | 3401 m | 957 m |
| SGRB | 425 m | 3331 m | 2906 m |
| SGRB | 2444 m | 3401 m | 957 m |
| SGRC | 2444 m | 3401 m | 957 m |
| SGRC | 425 m | 3331 m | 2906 m |
| SGRC | 2444 m | 3401 m | 957 m |
Logging Parameters (4 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| TENS | 2277 m | 3316 m | 1038 m |
| TENS | 2338 m | 3339 m | 1000 m |
| TENS | 3025 m | 3411 m | 385 m |
| TENS | 2240 m | 3414 m | 1173 m |
Miscellaneous (8 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 2444 m | 3401 m | 957 m |
| DEPTH | 425 m | 3335 m | 2910 m |
| DEPTH | 2442 m | 3405 m | 962 m |
| DEPTH | 388 m | 3334 m | 2946 m |
| DEPTH | 2446 m | 3404 m | 958 m |
| DEPTH | 3091 m | 3213 m | 122 m |
| MFIN | 388 m | 3334 m | 2946 m |
| MFIN | 2446 m | 3404 m | 958 m |
Mudlog (22 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ROP | 388 m | 3334 m | 2946 m |
| ROP | 2446 m | 3404 m | 958 m |
| RPM | 388 m | 3334 m | 2946 m |
| RPM | 2446 m | 3404 m | 958 m |
| SPP | 388 m | 3334 m | 2946 m |
| SPP | 2446 m | 3404 m | 958 m |
| SROP | 425 m | 3335 m | 2909 m |
| SROP | 2444 m | 3405 m | 961 m |
| TDEP | 2277 m | 3320 m | 1042 m |
| TDEP | 2338 m | 3339 m | 1000 m |
| TDEP | 3025 m | 3411 m | 385 m |
| TDEP | 2010 m | 3317 m | 1307 m |
| TDEP | 2338 m | 3339 m | 1000 m |
| TDEP | 3025 m | 3411 m | 385 m |
| TDEP | 2240 m | 3414 m | 1173 m |
| TDEP | 2240 m | 3414 m | 1173 m |
| TGAS | 388 m | 3334 m | 2946 m |
| TGAS | 2446 m | 3404 m | 958 m |
| TORQ | 388 m | 3334 m | 2946 m |
| TORQ | 2446 m | 3404 m | 958 m |
| WOB | 388 m | 3334 m | 2946 m |
| WOB | 2446 m | 3404 m | 958 m |
Neutron (4 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| HNPO | 2277 m | 3396 m | 1119 m |
| HTNP | 2277 m | 3396 m | 1119 m |
| NPHI | 2276 m | 3397 m | 1121 m |
| TNPH | 2276 m | 3397 m | 1121 m |
Resistivity (36 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| DI | 2355 m | 3394 m | 1039 m |
| HMIN | 2355 m | 3394 m | 1039 m |
| HMNO | 2355 m | 3394 m | 1039 m |
| HTEM | 2240 m | 3414 m | 1173 m |
| RLA0 | 2355 m | 3394 m | 1039 m |
| RLA1 | 2355 m | 3394 m | 1039 m |
| RLA2 | 2355 m | 3394 m | 1039 m |
| RLA3 | 2355 m | 3394 m | 1039 m |
| RLA4 | 2355 m | 3394 m | 1039 m |
| RLA5 | 2355 m | 3394 m | 1039 m |
| RM | 2355 m | 3394 m | 1039 m |
| RT | 2355 m | 3394 m | 1039 m |
| RXO | 2355 m | 3394 m | 1039 m |
| RXOZ | 2240 m | 3414 m | 1173 m |
| SDDE | 425 m | 3325 m | 2899 m |
| SDDE | 2444 m | 3399 m | 955 m |
| SEDA | 425 m | 3325 m | 2900 m |
| SEDA | 2444 m | 3399 m | 955 m |
| SEDP | 425 m | 3325 m | 2900 m |
| SEDP | 2444 m | 3399 m | 955 m |
| SEMA | 425 m | 3325 m | 2900 m |
| SEMA | 2444 m | 3399 m | 955 m |
| SEMP | 425 m | 3325 m | 2900 m |
| SEMP | 2444 m | 3399 m | 955 m |
| SESA | 425 m | 3325 m | 2900 m |
| SESA | 2444 m | 3399 m | 955 m |
| SESP | 425 m | 3325 m | 2900 m |
| SESP | 2444 m | 3399 m | 955 m |
| SEXA | 425 m | 3325 m | 2900 m |
| SEXA | 2444 m | 3399 m | 955 m |
| SEXP | 425 m | 3325 m | 2900 m |
| SEXP | 2444 m | 3399 m | 955 m |
| SFXE | 425 m | 3325 m | 2900 m |
| SFXE | 2444 m | 3399 m | 955 m |
| STEM | 425 m | 3325 m | 2900 m |
| STEM | 2444 m | 3399 m | 955 m |
Sonic (13 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 2282 m | 3299 m | 1017 m |
| DT | 2355 m | 3324 m | 969 m |
| DT2 | 2355 m | 3324 m | 969 m |
| DT4P | 2355 m | 3324 m | 969 m |
| DT4S | 2282 m | 3299 m | 1017 m |
| DT4S | 2355 m | 3324 m | 969 m |
| DT5 | 2282 m | 3299 m | 1017 m |
| DTCO | 2282 m | 3299 m | 1017 m |
| DTCO | 2355 m | 3324 m | 969 m |
| DTSM | 2282 m | 3299 m | 1017 m |
| DTSM | 2355 m | 3324 m | 969 m |
| PR | 2355 m | 3324 m | 969 m |
| VPVS | 2355 m | 3324 m | 969 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 2355 m | 3399 m | 1044 m |