Skip to content

Thebe 2

Carnarvon, Western Australia

Thebe 2 is a petroleum well in the Carnarvon, Western Australia, operated by BHP, drilled to a total depth of 2,550 M.

Request LAS Files & Well Summary

Well Information

Well Name
Thebe 2
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
BHP
Driller
Atwood
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,550 M
Datum Elevation
22.3 m
Spud Date
29/02/2008
Completion Date
11/05/2008
Permit
WA 346 P

Location

Latitude
-19.2601
Longitude
113.1310

Comments

Includes Thebe CH

Available Log Data

19
Log Streams
412
Curves
1,363,228
Data Points
163,152
Metres

Other (112 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ACTC 2310 m 2378 m 67 m
ACTC 2188 m 2245 m 56 m
ACTC 1969 m 2179 m 210 m
AJAM_MWD 2311 m 2378 m 67 m
AJAM_MWD 2188 m 2245 m 56 m
AJAM_MWD 1969 m 2179 m 210 m
AVG_CONF 2310 m 2378 m 67 m
AVG_CONF 2188 m 2245 m 56 m
AVG_CONF 1969 m 2179 m 210 m
AZIM_CONT_RT 2310 m 2373 m 62 m
AZIM_CONT_RT 2188 m 2239 m 50 m
AZIM_CONT_RT 1969 m 2166 m 196 m
BDTI 2310 m 2378 m 67 m
BDTI 2188 m 2245 m 56 m
BDTI 1969 m 2179 m 210 m
BHFG 2310 m 2378 m 67 m
BHFG 2188 m 2245 m 56 m
BHFG 1969 m 2179 m 210 m
CHK 2310 m 2378 m 67 m
CHK 2188 m 2245 m 56 m
CHK 1969 m 2179 m 210 m
CRS1 2220 m 2220 m 0 m
CRS1 2002 m 2138 m 136 m
CTH 2310 m 2378 m 67 m
CTH 2188 m 2245 m 56 m
CTH 1969 m 2179 m 210 m
CWOB 2310 m 2378 m 67 m
CWOB 2188 m 2245 m 56 m
CWOB 1969 m 2179 m 210 m
DRPM 2310 m 2378 m 67 m
DRPM 2188 m 2245 m 56 m
DRPM 1969 m 2179 m 210 m
EDRT 2310 m 2378 m 67 m
EDRT 2188 m 2245 m 56 m
EDRT 1969 m 2179 m 210 m
GR_CONF 2310 m 2373 m 62 m
GR_CONF 2188 m 2239 m 50 m
GR_CONF 1969 m 2166 m 196 m
GTF_RT 2215 m 2220 m 5 m
GTF_RT 1973 m 2167 m 193 m
HDTH 2310 m 2378 m 67 m
HDTH 2188 m 2245 m 56 m
HDTH 1969 m 2179 m 210 m
IMWT 2310 m 2378 m 67 m
IMWT 2188 m 2245 m 56 m
IMWT 1969 m 2179 m 210 m
INCL_CONT_RT 2310 m 2373 m 62 m
INCL_CONT_RT 2188 m 2239 m 50 m
INCL_CONT_RT 1969 m 2166 m 196 m
MIN_CONF 2310 m 2378 m 67 m
MIN_CONF 2188 m 2245 m 56 m
MIN_CONF 1969 m 2179 m 210 m
MTF_RT 2336 m 2336 m 0 m
MTF_RT 2215 m 2220 m 5 m
MTF_RT 1973 m 2167 m 193 m
OSTM 2310 m 2378 m 67 m
OSTM 2188 m 2245 m 56 m
OSTM 1969 m 2179 m 210 m
PMPT 2310 m 2378 m 67 m
PMPT 2188 m 2245 m 56 m
PMPT 1969 m 2179 m 210 m
RETI 2310 m 2378 m 67 m
RETI 2188 m 2245 m 56 m
RETI 1969 m 2179 m 210 m
RGX_RT 2310 m 2373 m 62 m
RGX_RT 2188 m 2239 m 50 m
RGX_RT 1969 m 2166 m 196 m
RHX_RT 2310 m 2373 m 62 m
RHX_RT 2188 m 2239 m 50 m
RHX_RT 1969 m 2166 m 196 m
ROPI 2310 m 2378 m 67 m
ROPI 2188 m 2245 m 56 m
ROPI 1969 m 2179 m 210 m
RPI5 2310 m 2378 m 67 m
RPI5 2188 m 2245 m 56 m
RPI5 1969 m 2179 m 210 m
S1AC 2310 m 2378 m 67 m
S1AC 2188 m 2245 m 56 m
S1AC 1969 m 2179 m 210 m
S2AC 2310 m 2378 m 67 m
S2AC 2188 m 2245 m 56 m
S2AC 1969 m 2179 m 210 m
SHK3TM_RT 2311 m 2378 m 67 m
SHK3TM_RT 2188 m 2245 m 56 m
SHK3TM_RT 1969 m 2179 m 210 m
SHKRATE_RT 2311 m 2378 m 67 m
SHKRATE_RT 2188 m 2245 m 56 m
SHKRATE_RT 1969 m 2179 m 210 m
SLIDE 2341 m 2341 m 0 m
SLIDE 2211 m 2229 m 18 m
SLIDE 1970 m 2164 m 194 m
SMOD 2310 m 2378 m 67 m
SMOD 2188 m 2245 m 56 m
SMOD 1969 m 2179 m 210 m
SPM1 2310 m 2378 m 67 m
SPM1 2188 m 2245 m 56 m
SPM1 1969 m 2179 m 210 m
SPM2 2310 m 2378 m 67 m
SPM2 2188 m 2245 m 56 m
SPM2 1969 m 2179 m 210 m
SPM3 2310 m 2378 m 67 m
SPM3 2188 m 2245 m 56 m
SPM3 1969 m 2179 m 210 m
SPM4 2310 m 2378 m 67 m
SPM4 2188 m 2245 m 56 m
SPM4 1969 m 2179 m 210 m
TOFB 2310 m 2378 m 67 m
TOFB 2188 m 2245 m 56 m
TOFB 1969 m 2179 m 210 m
TRSH_CONF 2310 m 2378 m 67 m
TRSH_CONF 2188 m 2245 m 56 m
TRSH_CONF 1969 m 2179 m 210 m

Borehole Geometry (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 1972 m 2380 m 407 m
DEVI 1967 m 2526 m 558 m
HAZI 1972 m 2380 m 407 m
HAZI 1967 m 2526 m 558 m
P1AZ 1972 m 2380 m 407 m
P1AZ 1967 m 2526 m 558 m
RB 1972 m 2380 m 407 m
TVD 2310 m 2378 m 67 m
TVD 2188 m 2245 m 56 m
TVD 1969 m 2179 m 210 m

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HCAL 1972 m 2361 m 389 m
HCAL 1968 m 2524 m 556 m
HDAR 1943 m 2446 m 502 m
HDAR 1968 m 2525 m 557 m

Chromato (24 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 1974 m 2450 m 476 m
ETHA 1967 m 2526 m 558 m
ETHA 1943 m 2380 m 436 m
ETHA 1981 m 2550 m 569 m
IBUT 1974 m 2450 m 476 m
IBUT 1981 m 2550 m 569 m
IPEN 1974 m 2450 m 476 m
IPEN 1981 m 2550 m 569 m
MDOU 1974 m 2450 m 476 m
MDOU 1347 m 2550 m 1203 m
METH 1974 m 2450 m 476 m
METH 1967 m 2526 m 558 m
METH 1943 m 2380 m 436 m
METH 1981 m 2550 m 569 m
MTIN 1347 m 2550 m 1203 m
MTIN 1974 m 2450 m 476 m
MTOU 1347 m 2550 m 1203 m
MTOU 1974 m 2450 m 476 m
NBUT 1974 m 2450 m 476 m
NBUT 1981 m 2550 m 569 m
NPEN 1974 m 2450 m 476 m
NPEN 1981 m 2550 m 569 m
PROP 1974 m 2450 m 476 m
PROP 1981 m 2550 m 569 m

CMR (27 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2105 m 2527 m 421 m
CBF1 2105 m 2527 m 421 m
CBF2 2105 m 2527 m 421 m
CBF3 2105 m 2527 m 421 m
CBF4 2105 m 2527 m 421 m
CBF5 2105 m 2527 m 421 m
CBF6 2105 m 2527 m 421 m
CBF7 2105 m 2527 m 421 m
CBP1 2105 m 2527 m 421 m
CBP2 2105 m 2527 m 421 m
CBP3 2105 m 2527 m 421 m
CBP4 2105 m 2527 m 421 m
CBP5 2105 m 2527 m 421 m
CBP6 2105 m 2527 m 421 m
CBP7 2105 m 2527 m 421 m
CBP8 2105 m 2527 m 421 m
CFF1 2105 m 2527 m 421 m
CFF2 2105 m 2527 m 421 m
CFF3 2105 m 2527 m 421 m
CFF4 2105 m 2527 m 421 m
CFF5 2105 m 2527 m 421 m
CFF6 2105 m 2527 m 421 m
CFF7 2105 m 2527 m 421 m
CMFF 2105 m 2527 m 421 m
KSDR 2105 m 2527 m 421 m
KTIM 2105 m 2527 m 421 m
TCMR 2105 m 2527 m 421 m

Density (16 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DSO8 1972 m 2424 m 452 m
DSOZ 1972 m 2424 m 452 m
DSOZ 1972 m 2525 m 553 m
HDRA 1972 m 2424 m 452 m
HDRA 1972 m 2525 m 553 m
HPRA 1972 m 2424 m 452 m
HPRA 1972 m 2525 m 553 m
PEF8 1972 m 2424 m 452 m
PEF8 1972 m 2525 m 553 m
PEFZ 1972 m 2424 m 452 m
PEFZ 1972 m 2525 m 553 m
RHBA 1972 m 2424 m 452 m
RHO8 1972 m 2424 m 452 m
RHO8 1972 m 2525 m 553 m
RHOZ 1972 m 2424 m 452 m
RHOZ 1972 m 2525 m 553 m

Dip and Scan (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DPAZ 2064 m 2380 m 315 m
DPTR 2064 m 2380 m 315 m
QUAF 1972 m 2380 m 407 m

GR (20 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 1943 m 2419 m 475 m
ECGR 1948 m 2521 m 573 m
EHGR 1943 m 2418 m 475 m
EHGR 1948 m 2521 m 573 m
EHGR_EDTC 1948 m 2539 m 590 m
GR 1475 m 1899 m 424 m
GR 1943 m 2419 m 475 m
GR 1972 m 2514 m 542 m
GR 1948 m 2521 m 573 m
GR_ARC 1380 m 2539 m 1159 m
GR_EDTC 1967 m 2526 m 558 m
GRM1 2310 m 2373 m 62 m
GRM1 2188 m 2239 m 50 m
GRM1 1969 m 2166 m 196 m
GRR 2310 m 2373 m 62 m
GRR 2188 m 2239 m 50 m
GRR 1969 m 2166 m 196 m
HGR 1943 m 2418 m 475 m
HGR 1948 m 2539 m 590 m
HGR 1948 m 2521 m 573 m

Logging Parameters (21 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CDF 1967 m 2526 m 558 m
CRPM_RT 2310 m 2378 m 67 m
CRPM_RT 2188 m 2245 m 56 m
CRPM_RT 1969 m 2179 m 210 m
CS 1943 m 2446 m 502 m
CS 1948 m 2539 m 591 m
SHKPK_RT 2311 m 2378 m 67 m
SHKPK_RT 2188 m 2245 m 56 m
SHKPK_RT 1969 m 2179 m 210 m
SHKRSK_RT 2311 m 2378 m 67 m
SHKRSK_RT 2188 m 2245 m 56 m
SHKRSK_RT 1969 m 2179 m 210 m
SHKTOT_RT 2337 m 2337 m 0 m
SHKTOT_RT 2220 m 2245 m 24 m
SHKTOT_RT 1970 m 2149 m 179 m
STICK_RT 2310 m 2378 m 67 m
STICK_RT 2188 m 2245 m 56 m
STICK_RT 1969 m 2179 m 209 m
TENS 1943 m 2446 m 502 m
TENS 1967 m 2526 m 558 m
TENS 1948 m 2539 m 591 m

Miscellaneous (36 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 1347 m 2550 m 1203 m
BITD 1974 m 2450 m 476 m
BS 1967 m 2526 m 558 m
DEPTH 1475 m 1998 m 522 m
DEPTH 2105 m 2527 m 421 m
DEPTH 2310 m 2378 m 67 m
DEPTH 1943 m 2446 m 502 m
DEPTH 1943 m 2429 m 486 m
DEPTH 1974 m 2450 m 476 m
DEPTH 2188 m 2245 m 56 m
DEPTH 1380 m 2553 m 1173 m
DEPTH 1967 m 2526 m 558 m
DEPTH 1972 m 2361 m 389 m
DEPTH 1968 m 2524 m 556 m
DEPTH 1943 m 2380 m 436 m
DEPTH 1972 m 2514 m 542 m
DEPTH 1969 m 2179 m 210 m
DEPTH 1974 m 2450 m 476 m
DEPTH 1948 m 2539 m 591 m
DEPTH 1948 m 2539 m 590 m
DEPTH 1981 m 2550 m 569 m
DEPTH 1347 m 2550 m 1203 m
MFIN 1347 m 2550 m 1203 m
MFIN 1974 m 2450 m 476 m
MWTI 2310 m 2378 m 67 m
MWTI 2188 m 2245 m 56 m
MWTI 1969 m 2179 m 210 m
ROPH 2310 m 2378 m 67 m
ROPH 2188 m 2245 m 56 m
ROPH 1969 m 2179 m 210 m
SPPA 2310 m 2378 m 67 m
SPPA 2188 m 2245 m 56 m
SPPA 1969 m 2179 m 210 m
TFLO 2310 m 2378 m 67 m
TFLO 2188 m 2245 m 56 m
TFLO 1969 m 2179 m 210 m

Mudlog (52 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
APRS_ARC 1380 m 2540 m 1160 m
ATMP 1380 m 2540 m 1160 m
BITT 1347 m 2550 m 1203 m
BITT 1974 m 2450 m 476 m
DXC 1347 m 2550 m 1203 m
DXC 1974 m 2450 m 476 m
ECD_ARC 1380 m 2540 m 1160 m
HKLD 2310 m 2378 m 67 m
HKLD 2188 m 2245 m 56 m
HKLD 1969 m 2179 m 210 m
MDIN 1974 m 2450 m 476 m
MDIN 1347 m 2550 m 1203 m
PITV 1347 m 2550 m 1203 m
PITV 1974 m 2450 m 476 m
ROP 2310 m 2378 m 67 m
ROP 2188 m 2245 m 56 m
ROP 1969 m 2179 m 210 m
ROP 1974 m 2450 m 476 m
ROP 1347 m 2550 m 1203 m
ROP5 2310 m 2378 m 67 m
ROP5 2188 m 2245 m 56 m
ROP5 1969 m 2179 m 210 m
ROP5_RM 1380 m 2553 m 1173 m
ROTT 1347 m 2550 m 1203 m
ROTT 1974 m 2450 m 476 m
RPM 2310 m 2378 m 67 m
RPM 2188 m 2245 m 56 m
RPM 1969 m 2179 m 210 m
RPMB 1347 m 2550 m 1203 m
RPMB 1974 m 2450 m 476 m
RPMT 2311 m 2378 m 67 m
RPMT 2188 m 2245 m 56 m
RPMT 1969 m 2179 m 210 m
SPP 1347 m 2550 m 1203 m
SPP 1974 m 2450 m 476 m
SWOB 2310 m 2378 m 67 m
SWOB 2188 m 2245 m 56 m
SWOB 1969 m 2179 m 210 m
TGAS 1974 m 2450 m 476 m
TGAS 1981 m 2550 m 569 m
THKD 2310 m 2378 m 67 m
THKD 2188 m 2245 m 56 m
THKD 1969 m 2179 m 210 m
TORQ 1974 m 2450 m 476 m
TORQ 1347 m 2550 m 1203 m
TREV 1347 m 2550 m 1203 m
TREV 2310 m 2378 m 67 m
TREV 2188 m 2245 m 56 m
TREV 1969 m 2179 m 210 m
TREV 1974 m 2450 m 476 m
WOB 1974 m 2450 m 476 m
WOB 1347 m 2550 m 1203 m

Neutron (8 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 1948 m 2521 m 573 m
HNPO 1943 m 2420 m 476 m
HTNP 1943 m 2420 m 476 m
HTNP 1948 m 2521 m 573 m
NPHI 1943 m 2420 m 476 m
NPHI 1948 m 2522 m 574 m
TNPH 1943 m 2420 m 476 m
TNPH 1948 m 2522 m 574 m

Resistivity (55 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
A16H 1400 m 2539 m 1139 m
A16L 1400 m 2539 m 1138 m
A22H 1400 m 2539 m 1138 m
A22L 1400 m 2539 m 1138 m
A28H 1400 m 2539 m 1138 m
A28L 1400 m 2539 m 1138 m
A34H 1400 m 2539 m 1138 m
A34L 1400 m 2539 m 1138 m
A40H 1400 m 2539 m 1138 m
A40L 1400 m 2539 m 1138 m
DI_HRLT 1972 m 2521 m 549 m
HMIN 1972 m 2424 m 452 m
HMIN 1972 m 2525 m 553 m
HMNO 1972 m 2424 m 452 m
HMNO 1972 m 2525 m 553 m
HTEM 1943 m 2446 m 502 m
HTEM 1948 m 2539 m 591 m
P16H 1400 m 2539 m 1138 m
P16L 1400 m 2539 m 1138 m
P22H 1400 m 2539 m 1138 m
P22L 1400 m 2539 m 1138 m
P28H 1400 m 2539 m 1138 m
P28L 1400 m 2539 m 1138 m
P34H 1400 m 2539 m 1138 m
P34L 1400 m 2539 m 1138 m
P40H 1400 m 2539 m 1138 m
P40L 1400 m 2539 m 1138 m
RLA0 1972 m 2521 m 549 m
RLA0 1972 m 2429 m 457 m
RLA1 1972 m 2521 m 549 m
RLA1 1972 m 2429 m 457 m
RLA2 1972 m 2521 m 549 m
RLA2 1972 m 2429 m 457 m
RLA3 1972 m 2521 m 549 m
RLA3 1972 m 2429 m 457 m
RLA4 1972 m 2521 m 549 m
RLA4 1972 m 2429 m 457 m
RLA5 1972 m 2521 m 549 m
RLA5 1972 m 2429 m 457 m
RM_HRLT 1972 m 2521 m 549 m
RPIHM 2310 m 2378 m 67 m
RPIHM 2188 m 2245 m 56 m
RPIHM 1969 m 2179 m 210 m
RT_HRLT 1972 m 2521 m 549 m
RXO_HRLT 1972 m 2521 m 549 m
RXO8 1972 m 2424 m 452 m
RXO8 1972 m 2525 m 553 m
RXOI 1972 m 2361 m 389 m
RXOI 1972 m 2521 m 549 m
RXOZ 1972 m 2424 m 452 m
RXOZ 1972 m 2525 m 553 m
TAB 1380 m 2539 m 1159 m
TEMP 2310 m 2378 m 67 m
TEMP 2188 m 2245 m 56 m
TEMP 1969 m 2179 m 209 m

Sonic (14 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 1485 m 1998 m 512 m
DTCO 1974 m 2514 m 540 m
DTCO1 1967 m 2526 m 558 m
DTCO2 1971 m 2526 m 555 m
DTCO3 1985 m 2526 m 540 m
DTSH5 1967 m 2526 m 558 m
DTSH6 1967 m 2526 m 558 m
DTSM 1751 m 1943 m 191 m
DTSM 1990 m 2514 m 523 m
DTST 1974 m 2526 m 552 m
PR 1752 m 1943 m 191 m
PR 1990 m 2514 m 523 m
VPVS 1752 m 1943 m 191 m
VPVS 1990 m 2514 m 523 m

SP (2 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 1972 m 2418 m 446 m
SP 1982 m 2519 m 537 m

SpectroLith (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
WANH_WALK2 1948 m 2539 m 591 m
WCAR_WALK2 1948 m 2539 m 591 m
WCLA_WALK2 1948 m 2539 m 591 m
WCOA_WALK2 1948 m 2539 m 591 m
WEVA_WALK2 1948 m 2539 m 591 m
WPYR_WALK2 1948 m 2539 m 591 m
WQFM_WALK2 1948 m 2539 m 591 m
WSID_WALK2 1948 m 2539 m 591 m