Digital Wireline Logs for Wandoo B13H
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wandoo B13H in the Carnarvon, Western Australia, operated by Vermilion, drilled to a total depth of 2,861 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,861 m
- Datum Elevation
- 44.0 m
- Spud Date
- 24/10/2008
- Completion Date
- 09/12/2008
- Permit
- WA 14 L
Location
- Latitude
- -20.1267
- Longitude
- 116.4360