Skip to content

Wheatstone 1

Carnarvon, Western Australia

Wheatstone 1 is a petroleum well in the Carnarvon, Western Australia, operated by Chevron Texaco, drilled to a total depth of 3,410 m.

Request LAS Files & Well Summary

Well Information

Well Name
Wheatstone 1
Basin
Carnarvon
State
Western Australia
Classification
FEST
Operator
Chevron Texaco
Driller
Transocean Inc.
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,410 m
Datum Elevation
26.3 m
Spud Date
23/07/2004
Completion Date
22/08/2004
Permit
WA 17 R
Rig
Sedco 703

Location

Latitude
-19.8496
Longitude
115.2750

Comments

Interpretative WCR available

Available Log Data

5
Log Streams
129
Curves
766,918
Data Points
163,620
Metres

Other (16 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DMRP 2983 m 3241 m 257 m
SWPC 2983 m 3147 m 164 m
SXGAS 2983 m 3241 m 257 m
SXO 2983 m 3241 m 257 m
T2L1 2983 m 3241 m 258 m
T2L2 2983 m 3241 m 258 m
T2L3 2983 m 3241 m 258 m
T2L4 2983 m 3241 m 258 m
T2L5 2983 m 3241 m 258 m
T2L6 2983 m 3241 m 258 m
T2L7 2983 m 3241 m 258 m
T2L8 2983 m 3241 m 258 m
U-1001 2983 m 3241 m 258 m
VWPC 2983 m 3147 m 164 m
VXGA 2983 m 3241 m 257 m
VXWA 2983 m 3241 m 257 m

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HDAR 2740 m 3390 m 650 m

Chromato (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 887 m 3410 m 2523 m
IBUT 887 m 3410 m 2523 m
IPEN 887 m 3409 m 2522 m
MDOU 243 m 3409 m 3166 m
METH 887 m 3410 m 2523 m
MTIN 243 m 3409 m 3166 m
MTOU 888 m 3410 m 2522 m
NBUT 887 m 3410 m 2523 m
NEOP 887 m 3409 m 2522 m
NPEN 887 m 3409 m 2522 m
PROP 887 m 3410 m 2523 m

CMR (31 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BFV 2983 m 3241 m 258 m
CBF1 2983 m 3241 m 258 m
CBF2 2983 m 3241 m 258 m
CBF3 2983 m 3241 m 258 m
CBF4 2983 m 3241 m 258 m
CBF5 2983 m 3241 m 258 m
CBF6 2983 m 3241 m 258 m
CBF7 2983 m 3241 m 258 m
CBP1 2983 m 3241 m 258 m
CBP2 2983 m 3241 m 258 m
CBP3 2983 m 3241 m 258 m
CBP4 2983 m 3241 m 258 m
CBP5 2983 m 3241 m 258 m
CBP6 2983 m 3241 m 258 m
CBP7 2983 m 3241 m 258 m
CBP8 2983 m 3241 m 258 m
CFF1 2983 m 3241 m 258 m
CFF2 2983 m 3241 m 258 m
CFF3 2983 m 3241 m 258 m
CFF4 2983 m 3241 m 258 m
CFF5 2983 m 3241 m 258 m
CFF6 2983 m 3241 m 258 m
CFF7 2983 m 3241 m 258 m
CMFF 2983 m 3241 m 258 m
KSDR 2983 m 3241 m 258 m
KTIM 2983 m 3241 m 258 m
T2LM 2983 m 3241 m 258 m
T2P1 2983 m 3241 m 258 m
T2P2 2983 m 3241 m 258 m
T2P3 2983 m 3241 m 258 m
TCMR 2983 m 3241 m 258 m

Density (6 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DPHI 2983 m 3213 m 230 m
HDRA 2743 m 3390 m 647 m
PEF8 2743 m 3390 m 647 m
PEFZ 2743 m 3390 m 647 m
RHO8 2743 m 3390 m 647 m
RHOZ 2743 m 3390 m 647 m

GR (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 244 m 2752 m 2507 m
GR 244 m 2752 m 2507 m
GR_CDR 875 m 2735 m 1859 m
GR_RAB 2752 m 3401 m 649 m
HCGR 2654 m 3384 m 730 m
HFK 2654 m 3384 m 730 m
HGR 244 m 2752 m 2507 m
HSGR 2654 m 3384 m 730 m
HTHO 2654 m 3384 m 730 m
HURA 2654 m 3384 m 730 m

Logging Parameters (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CRPM_RT 875 m 3409 m 2533 m
SHKPK_RT 875 m 3409 m 2534 m
STICK_RT 875 m 3409 m 2533 m
TENS 244 m 2752 m 2507 m
VIBLAT_RT 875 m 3409 m 2533 m
VIBTOR_RT 875 m 3409 m 2534 m
VIBX_RT 875 m 3409 m 2533 m

Miscellaneous (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 244 m 3411 m 3166 m
DEPTH 242 m 3410 m 3168 m
DEPTH 874 m 3409 m 2534 m
MFIN 243 m 3409 m 3166 m
MFOU 243 m 3409 m 3166 m

Mudlog (17 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ATMP_CDR 874 m 2739 m 1864 m
ECD_CDR 874 m 2739 m 1864 m
HKLD 243 m 3409 m 3166 m
MDIN 243 m 3409 m 3166 m
PRSA 874 m 2739 m 1864 m
ROP 243 m 3409 m 3166 m
ROP5_RM 875 m 3405 m 2529 m
RPMM 886 m 2754 m 1868 m
RPMS 243 m 3409 m 3166 m
RPMT 243 m 3409 m 3166 m
RPMT 875 m 3409 m 2534 m
SPP 243 m 3409 m 3166 m
TDEP 244 m 3411 m 3166 m
TGAS 888 m 3410 m 2522 m
TORQ 243 m 3409 m 3166 m
TTEM_RAB 2752 m 3405 m 653 m
WOB 243 m 3410 m 3167 m

Neutron (5 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
HNPO 2654 m 3387 m 733 m
HTNP 2654 m 3387 m 733 m
NPHI 244 m 2752 m 2507 m
NPOR 244 m 2752 m 2507 m
TNPH 244 m 2752 m 2507 m

Resistivity (16 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
ATR 875 m 2739 m 1863 m
HLLD 2743 m 3404 m 661 m
HLLG 2743 m 3404 m 661 m
HLLS 2743 m 3404 m 661 m
PSR 875 m 2739 m 1863 m
RESB 2752 m 3405 m 653 m
RESD 2752 m 3401 m 649 m
RESM 2752 m 3400 m 648 m
RESR 2752 m 3401 m 649 m
RESS 2752 m 3400 m 648 m
RXOZ 2743 m 3389 m 646 m
TAB 875 m 2735 m 1859 m
TAB 875 m 2739 m 1863 m
TAB 2752 m 3401 m 649 m
TAB 2752 m 3401 m 649 m
TEMP 986 m 2577 m 1591 m

Sonic (3 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 2483 m 3397 m 914 m
DTCP 2488 m 2794 m 306 m
DTSM 2740 m 3399 m 659 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2742 m 3369 m 627 m