Skip to content

Bunjong 1

Perth, Western Australia

Bunjong 1 is a petroleum well in the Perth, Western Australia, operated by Arc, drilled to a total depth of 2,205 m.

Request LAS Files & Well Summary

Well Information

Well Name
Bunjong 1
Basin
Perth
State
Western Australia
Classification
NEST
Operator
Arc
Driller
Century
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,205 m
Datum Elevation
13.0 m
Spud Date
04/12/2005
Completion Date
19/12/2005
Permit
WA L2
Rig
Rig 11

Location

Latitude
-29.2323
Longitude
114.9371

Available Log Data

5
Log Streams
67
Curves
856,445
Data Points
128,323
Metres

Other (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
PUMPS 115 m 2205 m 2090 m

Borehole Geometry (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GDEV 8 m 2165 m 2156 m
TVD 115 m 2205 m 2090 m
TVD 115 m 2205 m 2090 m

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
HDAR 502 m 2168 m 1666 m

Chromato (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 115 m 2205 m 2090 m
FLIN 115 m 2205 m 2090 m
IBUT 115 m 2205 m 2090 m
IPEN 115 m 2205 m 2090 m
METH 115 m 2205 m 2090 m
NBUT 115 m 2205 m 2090 m
NPEN 115 m 2205 m 2090 m
PROP 115 m 2205 m 2090 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
HDRA 504 m 2170 m 1666 m
HPRA 504 m 2170 m 1666 m
PEFZ 504 m 2170 m 1666 m
RHOZ 504 m 2170 m 1666 m

GR (3 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ECGR 15 m 2165 m 2150 m
GR 15 m 2165 m 2150 m
GRAFM 499 m 2193 m 1694 m

Logging Parameters (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TENS 8 m 2183 m 2174 m

Miscellaneous (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 504 m 2182 m 1678 m
DEPT 115 m 2205 m 2090 m
DEPT 8 m 2183 m 2174 m
DEPT 498 m 2203 m 1704 m
DEPT 115 m 2205 m 2090 m
DEPTH 115 m 2205 m 2090 m

Mudlog (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DXC 115 m 2205 m 2090 m
ECD 115 m 2205 m 2090 m
HKLD 115 m 2205 m 2090 m
ROP 115 m 2205 m 2090 m
ROPA 507 m 2203 m 1696 m
RPMB 115 m 2205 m 2090 m
RPMS 115 m 2205 m 2090 m
SPP 115 m 2205 m 2090 m
TGAS 115 m 2205 m 2090 m
TGAS 115 m 2205 m 2090 m
TQAV 115 m 2205 m 2090 m
TQMN 115 m 2205 m 2090 m
TQMX 115 m 2205 m 2090 m
WOB 115 m 2205 m 2090 m

Neutron (3 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 15 m 2167 m 2152 m
NPOR 15 m 2167 m 2152 m
TNPH 15 m 2167 m 2152 m

Resistivity (21 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
HART 504 m 2171 m 1667 m
HDI 504 m 2171 m 1667 m
HLLD 504 m 2171 m 1667 m
HLLG 504 m 2171 m 1667 m
HLLS 504 m 2171 m 1667 m
HMIN 504 m 2167 m 1663 m
HMNO 504 m 2167 m 1663 m
HRM 504 m 2182 m 1678 m
HTEM 8 m 2183 m 2174 m
RACEHM 498 m 2193 m 1694 m
RACELM 498 m 2193 m 1694 m
RPCEHM 498 m 2193 m 1694 m
RPCELM 498 m 2193 m 1694 m
RPIHM 498 m 2193 m 1694 m
RPTHM 498 m 2193 m 1694 m
RWA_HILT 504 m 2171 m 1667 m
RXO8 504 m 2167 m 1663 m
RXOZ 504 m 2167 m 1663 m
SW_HILT 504 m 2171 m 1667 m
TCDM 508 m 2201 m 1692 m
VCL_HILT 8 m 2165 m 2156 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 503 m 2174 m 1671 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 504 m 2157 m 1653 m