Skip to content

Dibblers 1

Perth, Western Australia

Dibblers 1 is a petroleum well in the Perth, Western Australia, operated by CalEnergy, drilled to a total depth of 525 m.

Request LAS Files & Well Summary

Well Information

Well Name
Dibblers 1
Basin
Perth
State
Western Australia
Classification
NAIN
Operator
CalEnergy
Driller
DCA
Data Summary
Partial WDS Available

Drilling Data

Total Depth
525 m
Datum Elevation
18.1 m
Spud Date
21/01/2011
Completion Date
09/02/2011
Permit
EP 437
Rig
Rig 7

Location

Latitude
-29.1099
Longitude
114.9064

Available Log Data

4
Log Streams
57
Curves
127,615
Data Points
18,003
Metres

Other (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
H2S2 220 m 525 m 305 m
H2S3 220 m 525 m 305 m

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CAL 239 m 526 m 286 m

Chromato (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CO2 220 m 525 m 305 m
ETHA 220 m 525 m 305 m
FLIN 220 m 525 m 305 m
H2S 220 m 525 m 305 m
IBUT 220 m 525 m 305 m
IPEN 220 m 525 m 305 m
METH 220 m 525 m 305 m
NBUT 220 m 525 m 305 m
NPEN 220 m 525 m 305 m
PROP 220 m 525 m 305 m

Density (4 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
LSN 236 m 523 m 286 m
PE 256 m 526 m 269 m
ZCOR 256 m 526 m 269 m
ZDNC 256 m 526 m 269 m

GR (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 10 m 506 m 495 m
GR1 234 m 521 m 286 m
GRSL 234 m 521 m 286 m
K 234 m 520 m 285 m
KTH 234 m 520 m 285 m
TH 234 m 520 m 285 m
U 234 m 520 m 285 m
U 210 m 505 m 294 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CHT 240 m 527 m 287 m
CHT 31 m 527 m 495 m

Miscellaneous (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 220 m 525 m 305 m
DEPT 220 m 525 m 305 m
DEPT 229 m 527 m 297 m
DEPT 7 m 527 m 520 m
SPD 240 m 527 m 287 m
SPD 31 m 527 m 495 m
SSN 236 m 523 m 286 m

Mudlog (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
HKLD 220 m 525 m 305 m
PVT 220 m 525 m 305 m
ROP 220 m 525 m 305 m
SPP 220 m 525 m 305 m
TGAS 220 m 525 m 305 m
TTEN 240 m 527 m 287 m
TTEN 31 m 527 m 495 m
WOB 220 m 525 m 305 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
CN 236 m 523 m 286 m
CNC 239 m 523 m 283 m

Resistivity (10 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
M2R1 257 m 521 m 264 m
M2R2 257 m 521 m 264 m
M2R3 257 m 521 m 264 m
M2R6 257 m 521 m 264 m
M2R9 257 m 521 m 264 m
M2RX 257 m 521 m 264 m
WRM 230 m 517 m 287 m
WRM 7 m 502 m 495 m
WTBH 229 m 517 m 287 m
WTBH 7 m 502 m 495 m

Sonic (2 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT24 222 m 510 m 287 m
TT 222 m 510 m 287 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SPDH 257 m 521 m 264 m