Skip to content

Hill River 3

Perth, Western Australia

Hill River 3 is a petroleum well in the Perth, Western Australia, operated by WAPET, drilled to a total depth of 264 m.

Request LAS Files & Well Summary

Well Information

Well Name
Hill River 3
Basin
Perth
State
Western Australia
Classification
NESR
Operator
WAPET
Data Summary
Partial WDS Available

Drilling Data

Total Depth
264 m
Datum Elevation
125.9 m
Spud Date
15/07/1962
Completion Date
30/07/1962
Permit
EP 27H

Location

Latitude
-30.0083
Longitude
115.1875

Available Log Data

1
Log Streams
6
Curves
7,975
Data Points
1,215
Metres

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 2 m 227 m 225 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 2 m 228 m 226 m

Mudlog (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
PRS 19 m 225 m 205 m

Resistivity (2 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LN 55 m 224 m 169 m
SN 52 m 227 m 174 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 14 m 228 m 213 m