Yardarino 4
Yardarino 4 is a petroleum well in the Perth, Western Australia, operated by WAPET, drilled to a total depth of 2,490 m.
Well Information
Drilling Data
- Total Depth
- 2,490 m
- Datum Elevation
- 43.9 m
- Spud Date
- 04/12/1964
- Completion Date
- 30/12/1964
- Permit
- EP27H
- Rig
- National 100
Location
- Latitude
- -29.2175
- Longitude
- 115.0442
Available Log Data
Caliper (1 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 2301 m | 2488 m | 187 m |
Chromato (4 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| BUTA | 2256 m | 2429 m | 173 m |
| ETHA | 2087 m | 2474 m | 386 m |
| METH | 954 m | 2489 m | 1535 m |
| PROP | 2088 m | 2429 m | 341 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 2011 m | 2423 m | 411 m |
Miscellaneous (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPT | 373 m | 2493 m | 2120 m |
| DEPT | 954 m | 2489 m | 1535 m |
Mudlog (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ROP | 954 m | 2489 m | 1535 m |
| TGAS | 954 m | 2489 m | 1535 m |
Resistivity (2 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| IND | 376 m | 2491 m | 2115 m |
| SN | 374 m | 2491 m | 2117 m |
Sonic (1 curves)
Acoustic travel time logs used for porosity estimation and seismic calibration.
| Curve | Start | End | Interval |
|---|---|---|---|
| DT | 2011 m | 2429 m | 417 m |
SP (1 curves)
Spontaneous potential logs measuring natural electrical potentials for permeability indication.
| Curve | Start | End | Interval |
|---|---|---|---|
| SP | 373 m | 2493 m | 2120 m |