Digital Wireline Logs for Kaimiro 13
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Kaimiro 13 in the Taranaki, New Zealand, operated by Fletcher Challenge, drilled to a total depth of 1,604 m. Ready for immediate petrophysical analysis.
Well Information
- Well Name
- Kaimiro 13
- Basin
- Taranaki
- State
- New Zealand
- Classification
- NPFD
- Operator
- Fletcher Challenge
- Driller
- Parker
Drilling Data
- Total Depth
- 1,604 m
- Datum Elevation
- -
- Spud Date
- 22/01/1997
- Completion Date
- 06/02/1997
- Permit
- PML-38091
- Rig
- Rig 252
Location
- Latitude
- -39.1764
- Longitude
- 174.1530