Skip to content

Digital Wireline Logs for Kaimiro 15

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Taranaki, New Zealand

Quality-controlled, spliced, and depth-matched wireline log data for Kaimiro 15 in the Taranaki, New Zealand, operated by Fletcher Challenge, drilled to a total depth of 2,320 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Kaimiro 15
Basin
Taranaki
State
New Zealand
Classification
NPFD
Driller
Parker

Drilling Data

Total Depth
2,320 m
Datum Elevation
-
Spud Date
25/02/1997
Completion Date
12/02/1997
Permit
PML-38091
Rig
Rig 188

Location

Latitude
-39.1489
Longitude
174.1710