Digital Wireline Logs for Kaimiro 15
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Kaimiro 15 in the Taranaki, New Zealand, operated by Fletcher Challenge, drilled to a total depth of 2,320 m. Ready for immediate petrophysical analysis.
Well Information
- Well Name
- Kaimiro 15
- Basin
- Taranaki
- State
- New Zealand
- Classification
- NPFD
- Operator
- Fletcher Challenge
- Driller
- Parker
Drilling Data
- Total Depth
- 2,320 m
- Datum Elevation
- -
- Spud Date
- 25/02/1997
- Completion Date
- 12/02/1997
- Permit
- PML-38091
- Rig
- Rig 188
Location
- Latitude
- -39.1489
- Longitude
- 174.1710