Digital Wireline Logs for Ngatoro 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Ngatoro 4 in the Taranaki, New Zealand, operated by NZOG, drilled to a total depth of 1,580 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,580 m
- Datum Elevation
- 297.7 m
- Spud Date
- 26/02/1993
- Completion Date
- 18/03/1993
- Permit
- -
- Rig
- Rig 16
Location
- Latitude
- -39.1920
- Longitude
- 174.1750