Digital Wireline Logs for Triceratops 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Triceratops 2 in the Papuan, Papua New Guinea, operated by InterOil, drilled to a total depth of 2,236 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,236 M
- Datum Elevation
- -999.2 m
- Spud Date
- 15/01/2012
- Completion Date
- 13/08/2012
- Permit
- PPL 237
- Rig
- Rig 2
Location
- Latitude
- -6.9771
- Longitude
- 144.7770