Digital Wireline Logs for Gibihi 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Gibihi 3 in the Bowen, Queensland, operated by Conoco, drilled to a total depth of 900 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 900 m
- Datum Elevation
- 128.0 m
- Spud Date
- 17/05/1995
- Completion Date
- 23/05/1995
- Permit
- -
- Rig
- Rig 2
Location
- Latitude
- -24.6294
- Longitude
- 149.9510