Digital Wireline Logs for Harcourt 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Harcourt 2 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 632 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 632 m
- Datum Elevation
- -
- Spud Date
- 11/04/2002
- Completion Date
- 20/04/2002
- Permit
- EPP 564
- Rig
- -
Location
- Latitude
- -25.4489
- Longitude
- 150.0220