Digital Wireline Logs for Jambin 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Jambin 2 in the Bowen, Queensland, operated by Nortex, drilled to a total depth of 257 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 257 m
- Datum Elevation
- -
- Spud Date
- 18/12/1961
- Completion Date
- 28/12/1961
- Permit
- EPP 78
- Rig
- -
Location
- Latitude
- -24.1917
- Longitude
- 150.4060