Digital Wireline Logs for Lonesome 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Lonesome 1 in the Bowen, Queensland, operated by Santos, drilled to a total depth of 723 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 723 m
- Datum Elevation
- 417.1 m
- Spud Date
- 23/02/2007
- Completion Date
- 11/03/2007
- Permit
- PL 234
- Rig
- Rig 151
Location
- Latitude
- -25.4039
- Longitude
- 148.9390