Digital Wireline Logs for Mundubbera 6
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mundubbera 6 in the Bowen, Queensland, operated by GSQ, drilled to a total depth of 791 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 791 M
- Datum Elevation
- -
- Spud Date
- 12/07/1975
- Completion Date
- 28/08/1975
- Permit
- -
- Rig
- -999.25
Location
- Latitude
- -25.2500
- Longitude
- 150.2000