Digital Wireline Logs for Mundubbera 8
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mundubbera 8 in the Bowen, Queensland, operated by GSQ, drilled to a total depth of 658 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 658 M
- Datum Elevation
- -
- Spud Date
- 01/01/1976
- Completion Date
- 24/02/1976
- Permit
- -
- Rig
- -999.25
Location
- Latitude
- -25.2333
- Longitude
- 150.2330