Digital Wireline Logs for Tilbrook 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tilbrook 3 in the Bowen, Queensland, operated by Sunshine, drilled to a total depth of 344 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 344 m
- Datum Elevation
- 316.8 m
- Spud Date
- 29/11/2004
- Completion Date
- 04/12/2004
- Permit
- ATP 688 P
- Rig
- Rig 7
Location
- Latitude
- -21.0234
- Longitude
- 147.7960