Yamala 2
Yamala 2 is a petroleum well in the Bowen, Queensland, operated by Santos, drilled to a total depth of 894 M.
Well Information
Drilling Data
- Total Depth
- 894 M
- Datum Elevation
- 188.0 m
- Spud Date
- 16/05/2005
- Completion Date
- 04/06/2005
- Permit
- ATP 553 P
- Rig
- Rig 151
Location
- Latitude
- -23.5659
- Longitude
- 148.3800