Digital Wireline Logs for Baryulah 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Baryulah 4 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,673 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,673 m
- Datum Elevation
- 67.9 m
- Spud Date
- 21/04/2001
- Completion Date
- 09/05/2001
- Permit
- PL 131
- Rig
- Rig 18
Location
- Latitude
- -27.7532
- Longitude
- 141.8720