Digital Wireline Logs for Chiron 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Chiron 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,848 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,848 m
- Datum Elevation
- 102.0 m
- Spud Date
- 16/04/2005
- Completion Date
- 25/04/2005
- Permit
- PL 30
- Rig
- Rig 32
Location
- Latitude
- -28.4722
- Longitude
- 141.0840