Digital Wireline Logs for Costa Central 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Costa Central 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,424 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,424 m
- Datum Elevation
- 81.4 m
- Spud Date
- 29/08/1997
- Completion Date
- 02/10/1997
- Permit
- ATP 259 P
- Rig
- Rig 11
Location
- Latitude
- -27.4138
- Longitude
- 141.9980