Digital Wireline Logs for Karmona 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Karmona 5 in the Cooper, Queensland, operated by Santos. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- -
- Datum Elevation
- 139.0 m
- Spud Date
- 06/10/2005
- Completion Date
- 19/10/2005
- Permit
- PL 81
- Rig
- Rig 32
Location
- Latitude
- -27.3115
- Longitude
- 141.8900