Digital Wireline Logs for Karwin 1 ST
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Karwin 1 ST in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,509 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,509 m
- Datum Elevation
- 113.0 m
- Spud Date
- 30/09/1996
- Completion Date
- 16/10/1996
- Permit
- -
- Rig
- Rig 32
Location
- Latitude
- -27.6285
- Longitude
- 142.3170