Digital Wireline Logs for Olympus 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Olympus 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,975 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,975 m
- Datum Elevation
- 87.3 m
- Spud Date
- 22/06/2004
- Completion Date
- 02/07/2004
- Permit
- ATP 259 P
- Rig
- Rig 18
Location
- Latitude
- -28.2079
- Longitude
- 141.6560