Digital Wireline Logs for Psyche 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Psyche 4 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,220 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,220 m
- Datum Elevation
- 70.0 m
- Spud Date
- 02/06/2005
- Completion Date
- 14/06/2005
- Permit
- -
- Rig
- Rig 18
Location
- Latitude
- -27.9294
- Longitude
- 141.8100