Digital Wireline Logs for Thoar 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Thoar 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,149 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,149 m
- Datum Elevation
- 73.0 m
- Spud Date
- 02/07/2005
- Completion Date
- 04/07/2005
- Permit
- PL 144
- Rig
- Rig 18
Location
- Latitude
- -28.0255
- Longitude
- 141.7750