Digital Wireline Logs for Turandot 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Turandot 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,762 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,762 m
- Datum Elevation
- 74.6 m
- Spud Date
- 31/12/2003
- Completion Date
- 12/01/2004
- Permit
- ATP 259 P
- Rig
- Rig 34
Location
- Latitude
- -28.0868
- Longitude
- 141.5310