Digital Wireline Logs for Windigo 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Windigo 1 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 2,565 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,565 m
- Datum Elevation
- 83.0 m
- Spud Date
- 21/08/1999
- Completion Date
- 07/09/1999
- Permit
- ATP 259 P
- Rig
- Rig 32
Location
- Latitude
- -27.3900
- Longitude
- 142.1080