Digital Wireline Logs for Yanda 15
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Yanda 15 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,953 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,953 m
- Datum Elevation
- 120.0 m
- Spud Date
- 04/01/2006
- Completion Date
- 15/01/2006
- Permit
- PPL 61
- Rig
- Rig 1
Location
- Latitude
- -27.4522
- Longitude
- 141.8070