Skip to content

Digital Wireline Logs for Zeus 3

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Cooper, Queensland

Quality-controlled, spliced, and depth-matched wireline log data for Zeus 3 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,751 M. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Zeus 3
Basin
Cooper
State
Queensland
Classification
NDFE
Operator
Santos
Driller
Saxon

Drilling Data

Total Depth
1,751 M
Datum Elevation
253.4 m
Spud Date
24/07/2011
Completion Date
04/08/2011
Permit
Pl-301
Rig
Rig 84

Location

Latitude
-28.0377
Longitude
141.9670