Digital Wireline Logs for Zeus 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Zeus 4 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,783 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,783 M
- Datum Elevation
- 253.5 m
- Spud Date
- 21/10/2012
- Completion Date
- 02/11/2012
- Permit
- PL 301
- Rig
- Rig 184
Location
- Latitude
- -28.0375
- Longitude
- 141.9570