Digital Wireline Logs for Zeus 7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Zeus 7 in the Cooper, Queensland, operated by Santos, drilled to a total depth of 1,786 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,786 M
- Datum Elevation
- 253.7 m
- Spud Date
- 28/11/2012
- Completion Date
- 10/12/2012
- Permit
- PL 301
- Rig
- Rig 184
Location
- Latitude
- -28.0440
- Longitude
- 141.9620